SHE-011/016/021/026/031/036/041/046
Premier Socketed Curved Team Shelter
Code:
Product:
Assembly Instructions
IMPORTANT
All bolts should be hand tightened where possible, until
the shelter has been fully assembled, then fully tighten.
Page 3
25
5
3
1
.) Attach the backbar (5) by sliding in-between the brackets on
the sideframes and line up the holes. You will need 3 people for
this as the sideframes need to be held with the uprights face
down on the floor, as shown in Figure 2. When the backbar is in
position, use 2 x BOL472 (22) to attach to the sideframes (Figure
1). Fix with a plastic washer (20) both sides and a nylock nut (18).
When doing so, make sure the backbar is orientated so that the
foot plate in the middle is pointing up towards the sky (Figure 2).
Figure 2.
Figure 1.
2
.) Attach the bent supports (3) to the
backbar by using BOL771 (25).
Locate the holes in the underside of the
backbar and line up the screw port within the
extrusion of the supports. With 1-2 people
holding the bent supports in position the
other person can screw the self tapping bolt
in place. This will require a 10mm extension
tool or the T-Handle nut driver (30) supplied
with the shelter. Make sure when doing so
that the bolt is straight as this is cutting the
thread at the same time. This is made easier
by ensuring the bent support is square with
the backbar (See Figure 3).
Figure 3.
22
5
18
20
Screw port
20