INS632
Revision 1
14/12/2017
Harrod UK Limited
©
IMPORTANT
PLEASE READ THE
A S S E M B LY I N S T R U C T I O N S
CAREFULLY BEFORE STARTING
TO ASSEMBLE YOUR GOAL
Maintenance note:
To ensure maximum manoeuvrability of the
weighted back bar, it is recommended to clean out any build-up of
debris from the rollers and bushes every 6 months. Remove the
roller as per Step 6 but in reverse order. Grease roller for improved
performance.
For information on goal post maintenance and inspection please
refer to “The FA Football Goals - Guidance Notes (July 2006)”,
available for download at
.
www.thefa.com
Pack Contents:
FBL-635 and FBL-637
3G Aluminium Weighted Portagoal
Code:
Product:
View of Product
Hi-Raise Wheel
Net Bar
Roller
9
8
6
7
11
Ballast
(inside)
(if applicable)
Crossbar
1
Upright
Side Bar
3
2
Axle Bar
(inside)
4
Net Support
5
Net Support
Brace
Tools Required
2 x 17mm Spanners
1 x Pair Scissors
1 x Mallet
1 x Step Ladder
12
FBL-635 7.32x2.44m 3G WEIGHTED PORTAGOAL
1:
2 x FEP360
7.32m CROSSBAR
2:
2 x FEP284
2.44m UPRIGHT
3:
2 x FEP402
2386mm SIDEBAR
4:
4 x PEP343
SNR NET SUPPORT
5:
4 x PEQ336 NET SUPPORT BRACE
6:
2 x FEQ308 7.32m AXLE BAR
7:
2 x PEQ710 7.32m NET BAR
8:
24 x STE029
600mm ROLLER
9:
1 x FPK321 HI-RAISE WHEELS
10: 1 x FPK560 7.32x2.44m FITTINGS PACK
(PAIR)
(PAIR)
(PACKED IN 2xFEQ320)
(PACKED IN 2xFEQ320)
(PACKED IN 1xFEQ805)
(PACKED IN 6xFEQ307)
(SEE NEXT PAGE)
FBL-637 6.4x2.13m WEIGHTED PORTAGOAL
1:
2 x FEP361
6.40m 3G CROSSBAR
2:
2 x FEP286
2.13m 3G PORTAGOAL UPRIGHT
3:
2 x FEP402
SNR/JNR WTD SIDEBAR
4:
2 x PEP291
1.83m WTD P/GOAL NET SUPPORT
5
4 x PEQ336 NET SUPPORT BRACE
6:
2 x FEQ376 6.4m WEIGHTED GOAL AXLE BAR
7:
2 x PEQ711 JUNIOR WTD P/GOAL ALI NET BAR (
8:
16 x STE029
600mm ROLLER
9:
1 x FPK321 HI-RAISE WHEELS
10: 1 x FPK563 4.88x1.83m FITTINGS PACK (
11: 4 x FEQ511 3230mm BALLAST TUBE
12: 4 x SEP028
747MM WG ROLLER
(PAIR)
(PAIR)
(PACKED IN 2 x FEQ291)
(PACKED IN 2 x FEQ291)
1 x FEQ806)
(4 x FEQ307)
SEE NEXT PAGE)
(2 x FEQ311)