SMALL PARTS FITTINGS PACK
(FPK313)
10) 12 x M12 NYLOC NUT
(BOL102)
11) 4 x M12 BOLT 110mm
(BOL110)
12) 8 x M12 BOLT 100mm
(BOL122)
13) 48 x M10 NYLOC NUT
(BOL202)
14) M10 FLAT WASHER FORM B S/S
(BOL711)
15) 8 x M10 x 75 C/S SOCKET SCREW
(BOL288)
16) 4 x M10 SET SCREW 50mm
(BOL306)
17) 24 x M10 SQUARE HEAD BOLT 25mm
(BOL336)
18) 4 x LARGE WASHER
(BOL702)
19) 40 x M10 PLAIN WASHER
(BOL709)
3G Folding Projection Goal
Code:
Product:
This product is protected by © Copyright
and Design Right Harrod UK Ltd 2006
Fittings Pack
20) 36 x M12 NYLON WASHER
(BOL724)
21) 2 x 0.5m CHAIN
(BOL818)
22) 2 x NET ROPE
(FBL-015)
23) 1 x “S” TYPE NET CLIPS
(FPK012)
24) 4 x BOTTOM HINGE BRACKET
(PEP193)
25) 4 x U-Bar M10 104X122.5mm ID
(SEP497)
26) 2 x L/H TOP HINGE BRACKET
(PEQ187)
27) 2 x R/H TOP HINGE BRACKET
(PEQ188)
28) 2 x CARABINER CLIP
(HKS008)
29) 1 x NET HOOKS
(Supplied with Crossbar)
(HKS029)
(Pack)
(pack)
10
11
12
13
14
15
16
17
18
19
20
21
23
24
25
26
27
28
29
Install Sockets
Fig.2a
1
Dig holes 600x600 square x
m
deep at centres shown in Fig 2a.
Position the sockets (3) 360mm centrally back from the front (court
side) of the fence/kick board. Concrete the sockets in leaving approx
40mm from top of concrete to ground level (for turf). Use a spirit level to
make sure that the sockets are truly vertical and support until set. Replace the
turf extracted when the concrete has cured (allow the concrete to set before
rest of the goal).
600 m
assembling the
3
4956mm CRS for 4.88m Crossbar
3736mm CRS for 3.66m Crossbar
PLAN VIEW
SIDE VIEW
Fence Line
600
600
600
360 Socket
centre to
front of fence/
kick board
40
Play Area
Fig.2b
100mm Socket
centre to
front of fence/
kick board
3
SIDE VIEW
600
600
40
PLAN VIEW
Fence Line
600
Play Area
Important:
Please ensure you match the part number of your goal to the
installation figures (2a or 2b) below.
1
Dig holes 600x600 square x
m
deep at centres shown in Fig 2b.
Position the sockets (3) 100mm centrally forward from the front (court
side) of the fence/kick board. Concrete the sockets in leaving approx
40mm from top of concrete to ground level (for turf). Use a spirit level to
make sure that the sockets are truly vertical and support until set. Replace the
turf extracted when the concrete has cured (allow the concrete to set before
rest of the goal).
600 m
assembling the
Socket Location: Behind Fence
FBL-580, FBL-583, FBL-586, FBL-588, FBL-581, FBL-584,
FBL-587, FBL-589, FBL-592, FBL-593
4956mm CRS for 4.88m Crossbar
3736mm CRS for 3.66m Crossbar
Socket Location: In Front of Fence
FBL-780, FBL-783, FBL-786, FBL-788, FBL-781, FBL-784,
FBL-787, FBL-789, FBL-792, FBL-793
FBL-580/583/586/588/581/584/587/589/592/593
780/783/786/788/781/784/787/789/792/793