background image

SMALL PARTS FITTINGS PACK

(FPK313)

10) 12 x M12 NYLOC NUT

(BOL102)

11) 4 x M12 BOLT 110mm

(BOL110)

12) 8 x M12 BOLT 100mm

(BOL122)

13) 48 x M10 NYLOC NUT

(BOL202)

14) M10 FLAT WASHER FORM B S/S

(BOL711)

15) 8 x M10 x 75 C/S SOCKET SCREW

(BOL288)

16) 4 x M10 SET SCREW 50mm

(BOL306)

17) 24 x M10 SQUARE HEAD BOLT 25mm

(BOL336)

18) 4 x LARGE WASHER

(BOL702)

19) 40 x M10 PLAIN WASHER

(BOL709)

3G Folding Projection Goal

Code:

Product:

This product is protected by © Copyright

and Design Right Harrod UK Ltd 2006

Fittings Pack

20) 36 x M12 NYLON WASHER

(BOL724)

21) 2 x 0.5m CHAIN

(BOL818)

22) 2 x NET ROPE

(FBL-015)

23) 1 x “S” TYPE NET CLIPS

(FPK012)

24) 4 x BOTTOM HINGE BRACKET

(PEP193)

25) 4 x U-Bar M10 104X122.5mm ID

(SEP497)

26) 2 x L/H TOP HINGE BRACKET

(PEQ187)

27) 2 x R/H TOP HINGE BRACKET

(PEQ188)

28) 2 x CARABINER CLIP

(HKS008)

29) 1 x NET HOOKS

(Supplied with Crossbar)

(HKS029)

(Pack)

(pack)

10

11

12

13

14

15

16

17

18

19

20

21

23

24

25

26

27

28

29

Install Sockets

Fig.2a

1

Dig holes 600x600 square x

m

deep at centres shown in Fig 2a.

Position the sockets (3) 360mm centrally back from the front (court
side) of the fence/kick board. Concrete the sockets in leaving approx

40mm from top of concrete to ground level (for turf). Use a spirit level to
make sure that the sockets are truly vertical and support until set. Replace the
turf extracted when the concrete has cured (allow the concrete to set before

rest of the goal).

600 m

assembling the

3

4956mm CRS for 4.88m Crossbar
3736mm CRS for 3.66m Crossbar

PLAN VIEW

SIDE VIEW

Fence Line

600

600

600

360 Socket
centre to
front of fence/
kick board

40

Play Area

Fig.2b

100mm Socket
centre to
front of fence/
kick board

3

SIDE VIEW

600

600

40

PLAN VIEW

Fence Line

600

Play Area

Important:

Please ensure you match the part number of your goal to the

installation figures (2a or 2b) below.

1

Dig holes 600x600 square x

m

deep at centres shown in Fig 2b.

Position the sockets (3) 100mm centrally forward from the front (court
side) of the fence/kick board. Concrete the sockets in leaving approx

40mm from top of concrete to ground level (for turf). Use a spirit level to
make sure that the sockets are truly vertical and support until set. Replace the
turf extracted when the concrete has cured (allow the concrete to set before

rest of the goal).

600 m

assembling the

Socket Location: Behind Fence
FBL-580, FBL-583, FBL-586, FBL-588, FBL-581, FBL-584,
FBL-587, FBL-589, FBL-592, FBL-593

4956mm CRS for 4.88m Crossbar
3736mm CRS for 3.66m Crossbar

Socket Location: In Front of Fence
FBL-780, FBL-783, FBL-786, FBL-788, FBL-781, FBL-784,
FBL-787, FBL-789, FBL-792, FBL-793

FBL-580/583/586/588/581/584/587/589/592/593
780/783/786/788/781/784/787/789/792/793

Reviews: