background image

Fitting the Net

- Unpack the Net (Sold separately) and identify the Crossbar edge by

locating the Crossbar Label. Attach the Net Hooks to the Net approx 250mm apart,
then insert the hook into the slot on the goal section and twist to lock as shown in Fig 10
(it is a good idea to fit the Net at all corners first, to make sure that it is fitted correctly).

This product is protected by © Copyright

and Design Right Harrod UK Ltd 2013.

Secure the Net Support to the Backbar

- Loosely secure the

bottom of the Net Support to the Bolt as shown in Fig 8, do not
fully tighten until the wheel has been fitted.

Fig 8

17

16

18

L/H Wheels

R/H Wheels

Fitting the Wheels

- Fit the wheels as shown in the Assembly Instructions included with the Wheels (INS606).

The Wheel positions are shown in Fig 9, but you must consult the Wheel Assembly Instructions for Important
Operational and Maintenance information.

Fig 9

10

Fig 10

10

19

10

19

19

3G Weighted Portagoal

Code:

Product:

FBL-435/436/437/438/439/440/441/445/446/447

Net

Wheels

Note: Only 1 set of wheels are
supplied with the 5-A-Side range
FBL-445, 446 & 447 & should be
positioned at the back of the goal
to support the weight within the
backbar.

330mm

Note: Use items
16 &17 on these bolts
if your goal is not
supplied with rear
wheels FPK264
(Item 19)

Please note, FPK264 is not supplied with

FBL-438 & FBL-439.

The FPK321 (Front) & FPK322 (Rear) CAM

wheels are installed on these goals

Reviews: