Please Note: For safety reasons, It is recommended that two or more people assemble this goal and it should take 45mins.
Sidebar and Backbar
- Lay the Sidebars and Backbar out as
shown in Fig 1 and insert the Ballast Box into the Backbar so
that it is inset 192mm. insert the Ballast into both ends of the
Box (Ballast quantities, sizes and shapes vary depending on
Goal size, so insert equal amounts into each goal taking care to
identify the differing lengths).
Sidebar
Sidebar
3
3
8
Ballast
9
8
Ballast
9
Backbar
Ballast Box
5
Backbar
4
Fix the Sidebars to the Backbar as shown in Fig 2.
Fig 1
Fig 2
This product is protected by © Copyright
and Design Right Harrod UK Ltd 2013.
Important
- Insert an additional 4 Square Head Bolts (item 15) from the Wheel
Fittings Pack into each Sideframe, these will be used later for the Wheels.
No Washers or
Nuts on these
three Bolts yet
17
16
11
15
Assembly Instructions
3G Weighted Portagoal
Code:
Product:
FBL-435/436/437/438/439/440/441/445/446/447