background image

Page 3

Socket Installation

600mm

600mm

Ground Level

Code

Product

FBL-850

Stadium Pro Freehanging Net Supports - 3 Post

IMPORTANT:

must

away

must

away

Outside sockets

be leant back 3° diagonally

from the goal. The centre socket

be leant back 1°

from goal

as indicated by the arrows above

i

OUTSIDE SOCKETS

CENTRE SOCKET

IMPORTANT:

Consult a construction engineer for advice where

required. Ensure concrete has fully hardened before proceeding with
your assembly

i

1.08m

1

Dig holes at a

600mm and concrete in Sockets (15), leaving 40-100mm from top of

concrete to ground level

minimum

3

15

PLAN VIEW

9.422m

4.711m

1m

19

40-100mm

Drainage Hole

Summary of Contents for FBL-850

Page 1: ...ime for concrete INS853 Revision 0 04 07 2016 FBL 850 Stadium Pro Freehanging Net Supports 3 Post 60 mins IMPORTANT Please read these assembly instructions carefully before starting to assemble your F...

Page 2: ...ost Strap Bracket 13 Strap 14 Socket Drop in Lid 15 Socket 16 Winch 18 Security Wire parts not shown M10 Nylon Spacer 8 Carbine Clip Strap Bracket Security Wire Bracket Winch Bracket 17 3 Post Headlin...

Page 3: ...acket 10 Security Wire Bracket 11 Winch Bracket 12 Mid Post Strap Bracket 13 Strap 14 Socket Drop in Lid 15 Socket 16 Winch 17 3 Post Headline 18 Security Wire parts not shown parts are not to scale I...

Page 4: ...e socket be leant back 1 from goal as indicated by the arrows above i OUTSIDE SOCKETS CENTRE SOCKET IMPORTANT Consult a construction engineer for advice where required Ensure concrete has fully harden...

Page 5: ...ST 9 2 6 12 4 16 10 5 3 7 TOP OF POST 17mm 6mm IMPORTANT only The Security Wire is to be used on the outside posts Please pay attention to the instructions below for each post i 1 1 11 6 2 HINT Place...

Page 6: ...t to the Security Wire Bracket on of the outside Posts Feed Wire around the Winch behind the Strap and through both loops in the Strap Bracket 9 12 16 13 2 Thread Strap 13 through the larger loop in t...

Page 7: ...the corner mesh 17 IMPORTANT Discard the Headline Rope that is packed with the net 4 Insert Posts in Sockets and attach one end of Headline 17 to a Strap Thread Headline through corner of Net 20 out...

Page 8: ...stribute the Security Wire evenly between the outside Posts only 21 20 17 7 Remove any sag from the roof of the Net Secure the top edge of the Net to the Headline and Security Wire using the Cable Tie...

Reviews: