![Harrod UK FBL-850 Assembly Instructions Manual Download Page 1](http://html1.mh-extra.com/html/harrod-uk/fbl-850/fbl-850_assembly-instructions-manual_4007239001.webp)
ASSEMBLY INSTRUCTIONS
i
i
*Goal and Net sold separately
2 people are recommended for this assembly
Estimated 60 minutes assembly time per goal (not including time for concrete)
INS853
Revision 0
04/07/2016
FBL-850
Stadium Pro Freehanging Net Supports - 3 Post
60
mins
IMPORTANT:
Please read these assembly instructions carefully before
starting to assemble your Freehanging Net Supports
IMPORTANT:
must
The sockets
be installed in a minimum of 0.6m of
concrete. Consult a construction engineer for advice where required
3