background image

    

 

 

 

 

SPA ENCLOSURE 

 
 

 

3

Step 2: Assembly of the posts for the ends 

 

1.

 

Insert the posts #12  in the posts  #13 and bolt them on the centers 

#1 of the first and last arch (Fig.J, H) 

2.

 

Fix the reinforcement #11 to the post  #13 of th e f irst arch (F ig.H), 

and at th e same t ime, fi x th e br aces at the bottom of the posts  

(Fig.I) to fix the structure to t

he floor,  w ithout h owever screwi ng 

them. Final anchoring will be made at the end of assembling 

3.

 

For the other end,  repeat the same method,

 except that the 

reinforcement of arch #11 must be fixed to the #12 at the bottom 

of the structure 

 

Step 3: Installation of the fabric on the principal structure   

 

1.

 

Unfold the fabr ic so that you can sl ip it by the si de of the structure , 

making sure that the ends ar e at  the right place. The fabric panel 

with thre e w indows must b e d irected towards the back of the 

shelter. Handle the fabric with care (Fig. N) 

2.

 

Center the fabr ic on the structure  without lacing i t. To know i f the 

fabric is w ell centered on the structure,  the d istances between the 

fastening bands at the bottom of the fabric and those between the 

first and last arch must be equal  

3.

 

Attach the cords of the fabric to the arches inside  

4.

 

Temporarily attach the fabr ic to the r idge i n the center (Fig. M) i n 

order to stabilize the fabric on the structure before final lacing 

 

Important 

 

Assemble the post of the front d oor with parts # 21, 22, 23, 24, 

25, and 26 (Fig.V) 

 

Once assembled, insert the post w ith care by t he top of the 

door’s pocket and when the post  is at handle l evel (Fig. W), 

insert the steel r ing #26 , then  pass the eyebolt in part #11 

(Fig.R) 

 

Install the 4 door supports to the eyelets at the top of the 

door, parts #27 to  piece #11 of the principal structure (Fig.R) 

 

 

5.

 

Adjust the wi dth at the base of the structure (144'' ) and lev el it by  

taking measures crosswise, from corner to corner (Fig.S) 

Summary of Contents for ABRI SPA

Page 1: ...de la stru cture principale et les coins d arches 38 des structures m obiles sont pratiquem ent identiques Ils ne peuvent tre invers s lors de l assemblage Donc a ssurez vous qu ils soient fix s la bo...

Page 2: ...z l querre qui sert d ancrage au bas des arches 15 Fig F G I K 3 Soulevez la prem i re arche et boulonnez les diagonales 5 aux poteaux de la premi re arche Fig L 4 Soulevez la deuxi m e arche Fig T et...

Page 3: ...11 Fig R Installez les 4 supports d e porte 27 aux illets de la partie sup rieu re de la porte et dans la pi ce 11 de la structure principale Fig R 5 Ajustez la largeur la base de la struct ure 144 e...

Page 4: ...boulonner que tr s l g rem ent Note les pi ces de m at riel avec Velcro 40 qui sont fix es en dessous des chariots sont attach es aux toiles des sections mobiles Assemblez les arches des structures m...

Page 5: ...ers le c t oppos en utilisant la m thode doubl e Fig GG Y sans tou tefois mettre la tens ion finale V rifiez ce que la toile au toit soit ajust e sans plis r ajustez les bandes de Velcro sous les char...

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ...ther the parts together in groups according to the illustrations on page SPA 900 2 Important The corner arches 3 of the pri ncipal structure and the corner arches 38 of the mov able structures are pra...

Page 12: ...holes and the posts 9 for the half arch i n the center Important put the end w ith the guard towards the top Fig A 2 Join the bottom of the posts of the first arch with the bottom of the posts of the...

Page 13: ...wards the back of the shelter Handle the fabric with care Fig N 2 Center the fabr ic on the structure without lacing it To know i f the fabric is w ell centered on the structure the d istances between...

Page 14: ...9 Begin lac ing w ith the cord beginning on one si de towards the opposite side usi ng the doubled method F ig Y wi thout howe ver putting final tension Make sure that the fabric on the roof is adjust...

Page 15: ...the rails 5 Firmly tighten the bolts of the caster wagons Step 6 Installation of the fabrics on the two sections of movable roof 1 Slip the fabri c by th e side Attach the Velcro ba nds of th e fabr i...

Reviews: