background image

D-H 22 S - 16.02.2002 / Vers.: 1

15

5  Blasting chamber illumination (24 V)

(See fig. 3, page 7)

The blasting chamber illumination (18) is operated with a safety low voltage of
24 volts.

Note

When exchanging the tubular lamp press both contacts (holder) slightly apart.

Before inserting a new tubular lamp press both contacts (holder) slightly
together to fasten the lamp securely.

6  Electrical fuse protection

(See fig. 2 page 6)

  The fuse for feeble currents 2,5 A/T (50) for the transformer is located on the

bottom side of the unit (blasting chamber illumination, automatic deactivation
device).

  The two main fuses (0.315 A/T) are built into the mains connection socket (15).

7  Accessing the electrical/pneumatic control system

(See fig. 2 page 6)

The electrical/pneumatic control system is located on the bottom side of the
unit in the front floor compartment (33).

Danger

Before opening the front floor compartments (33) switch off unit at main switch
(12) and pull the mains supply plug.

 Removing the 10 screws (34) opens the front floor compartment.

Summary of Contents for D-H 22 S

Page 1: ...Operating instructions Machine designation Manual blasting unit Machine type D H 22 S Machine no Keep for future reference...

Page 2: ...the manual blasting unit 4 2 3 Identification and description of the unit components 5 2 4 Initial setting into operation procedure 8 3 Operation 9 3 1 Connecting the blasting unit to the compressed...

Page 3: ...ever when not used properly or with care its use can lead to injuries of eyes or skin due to the sand blast leaving the injector If the front flap is open you should not activate the removable injecto...

Page 4: ...complies with the pertinent accident prevention regulations Foreign bodies should not be inserted through the ventilation openings of the unit 1 5 Marking of safety references contained in these instr...

Page 5: ...lumination 2 tubular lamps 18 W 24 V Compressed air capacity max approx 200 l min Weight approx 35 kg 2 2 Unpacking the manual blasting unit See fig 2 page 6 1 Take off top box lid Note Place the box...

Page 6: ...t is equipped with an automatic blasting agent circulation and a motor driven blower suction unit The ultra fine filter insert 7 guarantees dust free working conditions in which the resulting dust is...

Page 7: ...h 19 Injector holder 8 Insert sieve 31 Suction basket 12 Main switch 33 Front floor compartment 15 Mains connection socket 230 V 50 Hz 34 10 screws for front floor compartment 16 Compressed air connec...

Page 8: ...g cap 10 Knurled nut for insert sieve 43 2 M6 nuts 14 Filter bag 45 Air outlet 17 Strip with long holes 46 Suction motor 18 Blasting chamber illumination 24 V 47 Suction compartment 19 Injector holder...

Page 9: ...mains supply connection cable delivered with the unit socket 15 5 Check the filter unit see section 3 3 6 Actuate main switch 12 Note Switching the unit on at the main switch renders it electrically r...

Page 10: ...e following blasting agents Type of blasting agent Blasting agent class Polish blasting medium Al oxide cl 60 B 120 m EW 60 250 m EW 80 180 m Special fused alumina cl 150 A 150 m Caution The unit is d...

Page 11: ...stened securely to the connection nozzle 40 6 Close the door tightly to the filter compartment 4 by tightening the star grips fairly securely 3 4 Automatic deactivation device and filter control lamp...

Page 12: ...no case should you empty and re use the disposable paper filter bag as this irrespective of the possible damages to the operator s health causes the unit to malfunction Note Do not use compressed air...

Page 13: ...ten the two M6 nuts 43 securely and evenly 9 Slide filter bag 14 inside the wire basket 48 into the unit and press the plastic connection 41 back onto the nozzle 40 using both hands 10 Check filter un...

Page 14: ...t and by applying counter force to the injector casing 20 5 Check whether foreign matter is located in the nozzle bore and if necessary remove it 6 Worn out jets 22 diameter larger than 4 5 mm should...

Page 15: ...02 2002 Vers 1 Fig 4 Disassembling the injector 19 Injector holder 24 Injector edge 20 Injector casing 25 Screw 10 mm 21 Spring plug 26 Blasting agent suction hose 22 Blasting nozzle 27 Air hose 23 I...

Page 16: ...6 The fuse for feeble currents 2 5 A T 50 for the transformer is located on the bottom side of the unit blasting chamber illumination automatic deactivation device The two main fuses 0 315 A T are bu...

Page 17: ...n extension of the original guaranty period Normal wear and tear or damages resulting from incorrect operation are not covered by the terms of warranty In order to be able to provide you with a compre...

Page 18: ...regulation of 12 05 93 EC low voltage directive 73 23 EEC corresponding to 1 GSG regulation of 11 06 79 EC EMC directive 89 336 EEC corresponding to EMC law of 09 11 92 Following harmonizing standard...

Reviews: