background image

 

 

 

 

 

Usage and installation

 

 

 

The number of nozzles installed should be higher than the regulated minimum. 

 

The check valve should be installed higher than the water level in case water runs in to 
the air blower (figure 1.). 

 

The connection pipe of the air blower should be made from heat resistant materials. 

 

The air blower must be fixed and the connection pipe should be installed horizontally. 

 

The air blower can be turned on and off by an air pressure pulse. In case the blower 
does not work, please insert an air pressure pulse in the connection (white connection 
on the hood of the blower). 

 

Installation structure 

 

 
1. “D” in the figure is the connection with the thread, which can be mounted on pieces of 

32 and  

 33,5. 

2. “D” in de figure is the direct connection, which only fits on  

32 and  

33,5. 

 

 

MODEL 

Size (mm) 

 

Smooth outlet 

Threaded outlet 

L1 

H1 

H2 

 

L2 

L2 

ZFPX5310 

276 

50.5 

32  269 

43.5 

G1

½

 

52.5 

168 

179 

95 

130 

ZFPX5320 

276 

50.5 

32  269 

43.5 

G1

½

 

52.5 

168 

179 

95 

130 

Reviews: