VPL400-X:
Install Manual
21JULY2023 | 630-00159 B
14
INSTALLATION
VPL400-X: SECTION 4
BYPASS MODE
To operate the carriage during installation, prior to
gate and platform setup, several jumper plugs are
required.
1. Plug the Upper Landing Cable Connector and
Lower Landing Jumper Connector to the AC
Controller. The Upper Landing Cable does not
need to be wired into the gate interlock or
call/send at this point.
See Figure 4-9.
Figure 4-9
Lower Landing
Jumper
Upper Landing
Cable
2. Plug the cab control (8-pin), Safety Pan Jumper
(2-pin) and Platform Gate Jumper (4-pin) into
the Trailing Cable Connectors at the Platform
Harness.
See Figure 4-10.
Figure 4-10
Cab Control
Cable
Safety Nut Cable
Platform Gate
Jumper
Safety Pan
Jumper
Trailing Cable
3. Move the carriage up or down as needed to
finish the installation.
4. These jumpers may need to be removed at
the completion of installation. See Installation
Tower Check section on
Page 23
.
PLATFORM CONNECTION
1. Fasten the platform arms to the carriage with
the 4 ½
"
-13 x 3 1/4
"
bolts using ¾
"
tools using
the low profile nyloc nuts on the lower bolts
and a standard nyloc nut on the upper bolts.
See Figure 4-11.
Figure 4-11
2. Slide the platform onto the carriage arms then
fasten it in place with 6 ¼
"
-20 X 5/8
"
Phillips
head bolt using a Phillips screwdriver.
See Figure 4-12.
Figure 4-12
Summary of Contents for VPL400-X
Page 1: ...21JULY2023 630 00159 B VPL400 X VERTICAL PLATFORM LIFT INSTALLATION SERVICE MANUAL...
Page 2: ......
Page 37: ...VPL400 X Install Manual 21JULY2023 630 00159 B 37 NOTES...
Page 38: ...VPL400 X Install Manual 21JULY2023 630 00159 B 38 NOTES...
Page 39: ...VPL400 X Install Manual 21JULY2023 630 00159 B 39 NOTES...
Page 40: ...1500 Independence Blvd Suite 220 Sarasota FL 34234 800 833 0478 www harmar com...