Harman Trident SF160 Installation & Operating Manual Download Page 21

Beginning Manufacturing Date: N/A 

Ending Manufacturing Date: Active

Service Parts

SF260

IMPORTanT: THIs Is DaTED InfORMaTIOn. When requesting service or replacement 

parts for your appliance please provide model number and serial number. all parts listed 

in this manual may be ordered from an authorized dealer.

Stocked

at Depot

ITEM

DESCRIPTION

COMMENTS

PART NUMBER

7

 aquastat Replacement for White Rodgers  

Pre 1199

1-00-03500

Y

 aquastat sensor/a350 Control  a99BC-25C  

Post 1199

3-10-2992225

Y

 auastat Terminal Block 

Post 1199

1-10-03501a

 aquastat sensor Well 

Post 1199

3-10-935111

Y

 Controller a350aa-2C 

Post 1199

3-10-1350112

Y

 Power supply Y350R-1C 

Post 1199

3-10-935071

Y

 stage Module s350aa-1C 

Post 1199

3-10-7350111

Y

8

 side Jacket w/Hole 

2-00-00327-15s

9

 side Jacket without Hole 

2-00-07002-15s

10

 Top Jacket 

2-00-08132-15s

 aDC Cover 

2-00-01012P

 aDC Hinge 

3-31-01004

 Ash Pan 

1-10-25027

Y

 Boiler Coil Washer 

Pkg of 2

1-00-07007

 Boiler Electric Back-up for Johnson Controls (option) 

Post 1199

1-00-01019

 Boiler Kit assembly 

1-00-01020

 Brick 9” x 4-1/2” x 1-1/4”  (8 needed)

Pkg of 7

1-00-900450125

Y

 Brick angles 

1-00-01138

 set of cut Brick 

1-00-00842

Y

 Brick, 9" x 4-1/2" x 2-1/2", (used for Reducer) 

3-40-900450250

 Brick, full skid 

414 pcs

3-40-900450-414

 Din Rail End Clamp 

3-31-01021

 Din Rail, 8", (for Mounting Controls) 

3-31-01020

 Domestic Boiler Coil assembly  

1-00-07006

Domestic Coil Water Plate (8 holes, 1 fi tting, 2 nuts)

1-10-07006

 Door Pins, 3/8 x 1 7/8 

Qty 4 req

4-30-00138B

 Element Cover (for Back up) 

1-10-01008s

 flapper Hook 

Qty 2 req

2-00-01005B

 Gasket Glue, 32 oz 

3-42-4583

 Gasket, 1/2” Rope (load Door & ash Dppr)  

20 Ft

1-00-53500

Y

 Grate 15 in - Cast 

Qty 5 req

3-00-00208

Y

 Grate Holder 2 - Cast  

Qty 2 req

3-00-00193

Y

 Grate Holder 3 - Cast  

Qty 2 req

3-00-00194

Y

 Grate link 5 - cast 

3-00-00205

Y

 non-electric Boiler Kit (includes regulator & draft control) 

1-00-08012

 Draft Regulator Type C-20 (use with non-electric kit)  

3-91-05000

Y

 non-electric Draft Control assembly 

1-10-08013a

 spring Handle 

Pkg of 3

3-40-00086-3-3

 Touch-up Paint, aerosol 

3-42-7737

Summary of Contents for Trident SF160

Page 1: ...LER IS NOT PROPERLY INSTALLED A HOUSE FIRE MAY RESULT FOR YOUR SAFETY FOLLOW INSTALLATION DIRECTIONS CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA Contact your local authority such as municipal building department fire department fire prevention bureau etc to determine the need for a permit Save These Instructions Installation Ope...

Page 2: ......

Page 3: ...and automatically You may however need to learn a few basic skills to maintain a fire Especially if this is your first venture into solid fuel burning If you have any problems re read these instructions If you can not resolve the issue s Contact your Harman dealer Introduction Table Of Contents Packing List 4 Installation 5 Aquastat 6 Wiring 7 Venting 7 Plumbing 8 Operating Instructions 10 Startin...

Page 4: ...uit w 2 90 Fittings w nuts and 3 Chase Nipples w nuts 2 Manual Draft Control Knob Assembly 3 Brass Coil Spring Handle Notice The Aquastat controls supplied with the Boiler Kit are designed only to maintain water temperature within the boiler The actual heating system is controlled separately by your thermostat s opening zone valves or energizing circulation pump s Do not attach a thermostat to the...

Page 5: ...e block on the side of the boiler using the 2 5 16 X 3 4 in bolts and lock washers Assembly Install the Temperature Pressure Gauge into the pipe stub in the center of the round plate on the front of the boiler FIG 1 Install the A350 sensor wire all the way into the immersion well and screw the well into one of the top hole Turn the pressure relief valve into the stub on top of the boiler next to t...

Page 6: ...page 7 Lay the din rail on a flat surface with the flat side down Secure one end clamp on the left side Slide the A350 controller onto the rail from right to left until it is against the end clamp Slide the Y350 onto the rail and guide the plug in connector joining it to the A350 Next install the S350 again guiding the plug in connector carefully Install the other end clamp to the right side of th...

Page 7: ...t that the overheat dump would stop With the differential set at 15 using the temperatures above the circuit would re open stopping the overheat dump at a water temperature of 185 The 120V wiring is attached on the normally open and the common position The normally closed position is not used Re install the covers onto the three Controls Optional Items There is a domestic hot water coil available ...

Page 8: ...ssary to install a water coil in the Trident Boiler Tying in to an existing boiler must be done in the return line between the circulator and the existing boiler Run a pipe from there to a small circulator and then into the 1 1 4 in fitting on the rear of the Trident Boiler Next run a pipe from the 1 1 4 in fitting on the top of the Trident Boiler to a Tee fitting in the supply line of the existin...

Page 9: ...l whether open to increase heat or closed to decrease heat The S350 is used as overheat protection Since a wood or coal fire is still producing heat when the draft is closed this overheat protection is required You could have the S350 energize a circulating pump or a zone valve separate from the heating system or it could be hooked up so that it flows the heated water throughout the system Either ...

Page 10: ...on top of the newspaper Be sure this kindling is dry and no more than 3 4 in in diameter Layer the kindling in a crisscross type pattern to allow maximum air flow Next lay some larger pieces of wood on top of the kindling approximately 2 in diameter Using a match or lighter light the paper just inside the door Close and latch the firebox door and allow the fire to burn a few minutes After about fi...

Page 11: ... restored close the ash pan door and add a layer of coal to the fire bed Follow the instructions under Starting a Coal Fire When the new coal is thoroughly ignited and there is a substantial bed of hot coals the grates may then be shaken Ashes and Ash Removal Ashes should never be allowed to accumulate above the top of the ash pan Ashes in contact with the bottom of the grates act as insulation wh...

Page 12: ...iler During the first few hours of burning a blue smoke may be observed rising from the boiler This is the paint going through the curing process It is advisable to increase the amount of fresh air in the room during this break in period This can be achieved by opening doors and windows Don t be alarmed this is normal and will only last a short while Chimney Problems Not Enough Draft Chimney is to...

Page 13: ... are available for replacement from your Harman dealer Gaskets on the doors are there to regulate air to the firebox If a gasket is failing you ll notice difficulty in controlling the fire Inspect the gaskets regularly and replace with Harman supplied material only Specifications SF 160 SF 260 SF 360 Heating Capacity Square Feet 2200 Max 3200 Max 4500 Max Approximate BTU per hour wood or coal 90 0...

Page 14: ...new home construction warranty coverage begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authorized HHT dealer distributor whichever occurs earlier The warranty shall commence no later than 24 months following the date of product shipment from HHT regardless of the installation or occupancy date The warranty period for parts and la...

Page 15: ...IONS This warranty does not cover the following Changes in surface finishes as a result of normal use as a heating appliance some changes in color of interior and exterior surface finishes may occur This is not a flaw and is not covered under warranty Damage to printed plated or enameled surfaces caused by fingerprints accidents misuse scratches melted items or other external sources and residues ...

Page 16: ...16 3 90 70742R11_05 13 Notes ...

Page 17: ...17 3 90 70742R11_05 13 Date Of Service Performed By Description Of Service Service Maintenance Log ...

Page 18: ...99 3 10 935111 Y 4 stove Water Plate 6 holes 1 fitting 1 10 08024 Gasket Boiler Plate 3 10 24758 Y 5 Door Handle Cast Qty 2 req 4 00 00042 Y Door latch 4 sets 1 00 00036 Y load Door Cast 4 00 00197P Y Draft Control Knob Cast Qty 2 req 4 00 00109 1 6 long shaker Handle Weldment 1 10 01005 Y shaker Bar Weldment 4 1 4 1 10 02017W Y shaker Block 2 00 01037 1 Y shaker Bracket 2 00 01047B shaker Handle ...

Page 19: ...r Coil Washer Pkg of 2 1 00 07007 Boiler Electric Back up for Johnson Controls Post 1199 1 00 01019 Boiler Kit assembly 1 00 01020 Brick 9 x 4 1 2 x 1 1 4 6 needed Pkg of 7 1 00 900450125 Y Brick angles Pkg of 4 1 00 01138 set of cut brick 1 00 08124 Y Brick full skid 414 pcs 3 40 900450 414 Brick 9 x 4 1 2 x 2 1 2 Used with reducer 3 40 900450250 Din Rail 8 for Mounting Controls 3 31 01020 Din Ra...

Page 20: ...nt 3 10 78427 Y 3 stove Water Plate 6 holes 1 fitting 1 10 08024 Gasket Boiler Plate 3 10 24758 Y 4 Door Handle Cast Qty 2 req 4 00 00042 Y Door latch 4 sets 1 00 00036 Y Draft Control Knob Cast Qty 2 req 4 00 00109 1 load Door Cast 4 00 00195P flapper Weldment 17 1 2 1 10 00407 5 long shaker Handle Weldment 1 10 01005 Y shaker Bar Weldment 4 11 16 1 10 02018W Y shaker Block 2 00 01037 1 Y shaker ...

Page 21: ...of 2 1 00 07007 Boiler Electric Back up for Johnson Controls option Post 1199 1 00 01019 Boiler Kit assembly 1 00 01020 Brick 9 x 4 1 2 x 1 1 4 8 needed Pkg of 7 1 00 900450125 Y Brick angles 1 00 01138 set of cut Brick 1 00 00842 Y Brick 9 x 4 1 2 x 2 1 2 used for Reducer 3 40 900450250 Brick full skid 414 pcs 3 40 900450 414 Din Rail End Clamp 3 31 01021 Din Rail 8 for Mounting Controls 3 31 010...

Page 22: ...oles 1 fitting 1 10 08024 Gasket Boiler Plate 3 10 24758 Y 4 Door Handle Cast Qty 2 req 4 00 00042 Y Door latch 4 sets 1 00 00036 Y Draft Control Knob Cast Qty 2 req 4 00 00109 1 load Door Cast 4 00 00195P flapper Weldment 17 1 2 1 10 00407 5 long shaker Handle Weldment 1 10 01005 Y shaker Bar Weldment 4 11 16 1 10 02018W Y shaker Block 2 00 01037 1 Y shaker Bracket 2 00 01047B shaker Handle Mount...

Page 23: ...01004 ash Pan 1 10 35027 Y Boiler Coil Washer Pkg of 2 1 00 07007 Boiler Electric Back up for Johnson Controls Post 1199 1 00 01019 Boiler Kit assembly 1 00 01020 Brick 9 x 4 1 2 x 1 1 4 standard 20 needed Pkg of 7 1 00 900450125 Y Brick angles Pkg of 4 Qty 2 req 1 00 01138 Brick 9 x 4 1 2 x 2 1 2 used with Reducer 3 40 900450250 Brick full skid 414 pcs 3 40 900450 414 Din Rail End clamp 3 31 0102...

Page 24: ...100 Recycled Paper At Harman we build each product to a standard not a price Signature of Boxer Your premium quality hearth product designed and assembled by the experienced and skilled members at Harman in Halifax PA USA ...

Reviews: