background image

6

3-90-774256_R4  •  03/21

Venting

Follow vent manufacturers guidelines and maintain proper clearance to combustibles.

You must use a minimum 12” vertical section 

of vent pipe attached to the flue stub.

Vent pipe within cabinet must be wrapped with the 

included insulation to prevent overheating of motors and 

components. Secure the insulation with the wire wraps.

Must use an approved wall pass-through or thimble where 

venting penetrates an external wall.

Start the insulation with this point in the rear 

of the flue stub. The insulation will wrap two 

times around the pipe. Secure it in place 

with the two pieces of wire supplied.

Reviews: