Accentra 52i Pellet Insert Zero Clearance Cabinet

Part #1-00-574323

2

Contents of Kit;

     Cabinet components-

 

1-  Top Panel

 

1-  Bottom Panel

 

2-  Side Panels

 

1-  Rear Panel

32-  #10 X 3/4” Tek Screws (Self-Tapping)

4- 1/4-20 x 5/8 Thread Cutters

Tools Needed;

Cordless Drill or Screw gun

5/16” Driver Bit

3/8” Driver Bit

CAUTION!  Use care when installing Tek screws, 

do not strip the holes.

•  Begin with the bottom panel lying flat on the floor or 

workbench. Place it with the writing facing upward 

as shown.

•  Stand a side panel up to the right or left side of the 

bottom. Notice the bend at the rear of the cabinet 

will make the corner and at the front it will be bent 

outward  to  make  the  facing  flange.  Line  up  the 

holes and secure the side panel to the bottom with 

(3) Tek screws. Repeat for the opposite side. Figure 

1.

NOTE: Only install 3 Tek screws.

•  The top panel can now be put into place, with the 

bend going out over the side panels. Align the holes 

and secure with (6) Tek screws. Figure 2.

•  Stand the rear panel up to the rear of the cabinet 

making sure the holes on the edge of the panel 

line up with the holes from the side panels and top. 

Secure the rear panel to the outside of the cabinet 

using the remaining (20) Tek screws. Figure 3.

Figure 1

Figure 2

Figure 3

1/4-20 x 5/8 

Thread Cutters

Summary of Contents for Accentra 52i

Page 1: ...Insert Zero Clearance Cabinet Part 1 00 574323 R Todd Instruction Sheets_3 89 574323_RevF www harmanstoves com Accentra 52i Pellet Insert ZC Cabinet Accentra 52i Pellet Insert Mounting Frame Accentra...

Page 2: ...the bottom Notice the bend at the rear of the cabinet will make the corner and at the front it will be bent outward to make the facing flange Line up the holes and secure the side panel to the bottom...

Page 3: ...ls Note When Fiberglass insulation is placed directly on top of the ZC Cabinet it should not touch the pipe The outer ring knockout of the flue pipe opening is designed to install a standard 6 sheetme...

Page 4: ...ccentra Insert They are only to secure cabinet to the wall framing Adequate framing under the hearth and ZC cabinet MUST be provided The finished face of the fireplace facade MUST be flush with the ZC...

Page 5: ...of the fireplace facade MUST be flush with the ZC Cabinet front face when completed NOTE See following pages for rough in instructions for other facing materials NOTE When fiberglass insulation is pl...

Page 6: ...Accentra 52i Pellet Insert Zero Clearance Cabinet Part 1 00 574323 6 28 3 16 29 9 16 Rough Opening Minimum Minimum Depth 16 7 8...

Page 7: ...L Vent Pipe 1 00 574034 Drill 10x3 4 Tek Screws Precut Alignment Hole 4 1 4 20 x 5 8 thread cutters hold the starter collar into place until the Accentra 52i mounting frame is installed Drill 10x3 4 T...

Page 8: ...ting frame into the cabinet after rough in has been complete There are 4 cabinet mounting holes in the bottom that go all the way through the base of the cabinet These holes allow the installer to sec...

Page 9: ...fiberglass insulation is placed directly on top of the ZC Cabinet it should not touch the vent pipe The outer ring knockout of the flue pipe opening is designed to install a standard 6 sheetmetal star...

Page 10: ...r PL Vent manufacturer s firestop space and support Venting clearances for in room installation of the Zero Clearance Cabinet NOTE Illustrations reflect typical installations and are FOR DESIGN PURPOS...

Reviews: