![Harman Stove Company PB 105 Installation & Operating Manual Download Page 40](http://html.mh-extra.com/html/harman-stove-company/pb-105/pb-105_installation-and-operating-manual_600566040.webp)
1
T
urn Mode Selector
to OFF
.
2 Use heat exchanger cleanout rods to clean the heat exchanger tubes.**
3 Scrape the air holes in the burnpot.**
4 Fill the hopper with pellets.
5
T
urn Feed
Adjuster
to “T
est”.*
6 Check the Combustion Blower and Feeder Motor for operation.*
7
T
urn Feed
Adjuster
back to the #4 setting.
8
T
urn the MAX
TEMP
dial to the desir
ed temperatur
e.
9
T
urn MIN
TEMP
dial to the desir
ed settings.*
10 Flip the igniter
switch to
Auto.*
The boiler will ignite if the temperature of the boiler water is less than the
temperature set on MAX TEMP dial..
*See the section on Operation for information
about Manual Lighting and Emergency Power
.
**See the section on Maintenance for more details
about cleaning.
Quick Refer
ence (
Auto-Light )
Summary of Contents for PB 105
Page 2: ......
Page 10: ...10 Venting Fig 3 ...
Page 15: ...15 Installing Duct Installation ...
Page 17: ...17 Installation ...
Page 18: ...18 Installation ...
Page 19: ...19 Installation ...
Page 33: ...33 Feeder Parts ...
Page 35: ...35 Wiring Diagram Wiring Diagram ...
Page 38: ...Testing Label 38 ...
Page 39: ...NOTES 39 ...