CLR Mooring Winch
Installation and Maintenance Manual - Mod.A
8.4 Functional test
NOTE!
Before installing the led lights and using the winch, proceed with a functional test to verify if the
mechanics and the electric parts are correclty installed.
To start the functional test, follow the procedure below:
1. Switch on the motor power by pressing the HCP button (shown in the DFCB wiring diagrams).
2. Press the first electric button installed on the deck.
3. Keep pushed the electric button until the come-out stroke of the drum of the winch is
completed.
In this phase, the drum rotates clockwise.
4. Press the second electric button to let the drum into the base of the winch.
In this phase the drum rotates counter-clockwise.
5. Keep pushed the electric button until the come-in stroke of the drum is completed.
NOTE!
For all info regarding the use of the winch, refer to the User Manual available in paper form,
included into the packaging of the purchased winch, and available on our website
www.harken.com.
After the cabling, pass the fiber optics cables throughout the slots realized into the deck not used for the
passage of the drum of the winch.
The installation of the fiber optics is completed by inserting the fiber optics cables into the holes of the top
flange:
8.5 Led lights installation
After installing the motor and the Dual Function Control Box, proceed with the installation of the led lights.
CLR Mooring Winch is equipped with 4 fiber optics that carry on the lights coming from the led lights
sources to the columns of the drum of the winch.
Led lights are to be installed from the underdeck side.
Fiber optics are to be cabled to the led light box:
Fiber optics
Led light box