![Harken Carbon Installation Manual Download Page 14](http://html2.mh-extra.com/html/harken/carbon/carbon_installation-manual_4060691014.webp)
COMMISSIONING
Tying Soft Attachment Lines
14
2/2.5 Carbon Furler
December 2001
7
Finished bend drawn up and set. If your bend does not
look like this untie and repeat the process.
8
It is important to keep tack/luff as close to torque tube and
as low as possible. A tack line that is too long will angle up
too far and damage the carbon tunnels. When sail is bent on,
check to make sure tack line is not pulling up against the
carbon tunnels.
6
9
If furler is installed under deck, lace tack pendant as
pictured. Rigging a pendant directly from carbon tunnels
will damage unit.