11
www.hardlifeutility.com
Figure 8 (C2640)
FRAME INSTALLATION
1. Erect the assembled first arch to the standing position. Insert one end of the assembled arch into one base
plate and force the other end of the arch into the opposite base plate, as shown in
Figures 5, 6, 7, and 8.
2. Install the second arch in the same manner immediately after installing the first arch, and connect the
two arches using connection purlins (component code 4). Secure the purlins using M10 X 80 mm bolts
(component code 10), as shown in
Figures 7, 8, 9, and 10.
There are five pieces of connection purlins be-
tween two group arches.
3. Install the third arch and connect the connection purlins. Install all the other arches in the same manner
and connect the purlins, as shown in
Figures 9 and 10.
4. Finally, install the supporting tubes (component code 5) between the first and last group of arches and
connect using M8 x 70 mm bolts (component code 9) and clips (component code 6), as shown in F
igures
7, 8, 9, and 10.
5. Tighten all the frame bolts, connection purlins, and supporting tubes adequately before installing the roof
cover
.
Summary of Contents for C2620
Page 1: ...INSTRUCTION MANUAL C2620 C2640 CONTAINER SHELTERS www hardlifeutility com ...
Page 2: ......
Page 10: ...8 www hardlifeutility com Figure 4 C2640 ...
Page 14: ...12 www hardlifeutility com Figure 9 C2620 Figure 10 C2640 ...
Page 17: ...15 www hardlifeutility com Figure 13 C2620 Figure 14 C2640 ...
Page 20: ...18 www hardlifeutility com INSTALLATION PHOTOS ...
Page 21: ...19 www hardlifeutility com ...
Page 23: ...21 www hardlifeutility com ...