5 - Operation
29
Diaphragm pumps
The maximum number of revolutions when in use is 540 r.p.m. It is self-
priming and can be run dry. The pump is fitted with 2 diaphragms.
μ
ATTENTION! Be careful to make sure the pump is perfectly
greased when it is to be used.
μ
ATTENTION! See section “Maintenance” regarding lubrication
intervals.
UX/70 and UG/102 piston pumps
This pump is a 3-cylinder piston pump. The max. number of revolutions
when in use is 540 rpm.
€
WARNING! Do NOT let piston pumps run dry for more than 30
seconds. If the pump is running dry for longer time the pistons
and liners will overheat and be destroyed. Always prime the
pump before use.
μ
ATTENTION! Check oil level before start up. Also see the section
“Maintenance” regarding oil change intervals.
÷
NOTE! This pump model is used in certain countries only.
Filling the main tank
The tank is filled with water through the filling hole by removing the lid located on the top of the tank. The water used should
be as clean as possible to obtain best results.
Fill the tank using the filter to prevent impurities from entering the tank. For greater filling capacity, an overhead tank can be
used.
The tank should be filled to a third of its capacity with clean water before adding the chemical product. Always follow the
instructions given on the product label!
μ
ATTENTION! Always fill through the tank strainer to prevent impurities from entering the tank.
€
DANGER! Do not place the filling hose inside the tank. Keep it out
of the tank at all times and only point it towards the filling hole. If
the pressure hose were placed inside the tank and there was a
drop in water supply pressure, the chemical product could be
syphoned back and contaminate the water supply lines, plant
and well.
€
WARNING! If spray liquid is left in the tank, for safety reasons all
valves must be shut.
μ
ATTENTION! The water supply line should be provided with a check valve as additional safety precaution. Follow local
legislation in force at any time.
μ
ATTENTION! The water supply should be provided with a meter to avoid spillage by over-filling. Follow local
legislation in force at any time.
Summary of Contents for ZEBRA AXIAL
Page 1: ...ZEBRA Original Instruction book 67026102 100 version 1 00 GB 08 2015 www hardi es ...
Page 6: ...Table of Contents 6 ...
Page 8: ...1 EC Declaration 8 ...
Page 20: ...3 Description 20 ...
Page 26: ...4 Start up 26 ...
Page 54: ...Index 54 ...
Page 56: ...ILEMO HARDI S A U Poligono Industrial El Segre 712 713 25080 Lleida SPAIN ...