22
Transport position
The boom and transport brackets are to be adjusted so that boom
movement is prevented when in transport.
1. Fold the outer sections and then the inner sections until the folding
rams are at minimum length and carefully place the boom in the
transport brackets.
NOTE: The following is best done without pressure in the hydraulic
rams.
2. Loosen counter nut C and adjust the length of the rod F until the
boom rests against G at the transport bracket.
H
G
3. Now move the boom stop H on
the transport bracket up to the
boom. Tighten counter nuts.
Summary of Contents for LZ Series
Page 18: ...1 x 40 2A x 12 B x 40 3 x 20 4 x 40 18 26 7 8 7 11 12 27 33 22 23 ...
Page 19: ...5 x 40 6 x 40 19 21 ...
Page 20: ...7 A x 40 B x 40 8 x 20 9 x 40 20 23 ...
Page 35: ...35 Electric and hydraulic diagram Boom raise lower ...
Page 36: ...36 Electric and hydraulic diagram Distribution box ...
Page 37: ...37 Electric and hydraulic diagram hydraulic system ...
Page 42: ...42 24 m LHZ 20 m LHZ 21 m LHZ 18 m LHZ 16 m LHZ 15 m LHZ 12 m LHZ ...
Page 44: ...44 A13 ...
Page 45: ...45 B104 ...
Page 46: ...B105 ...
Page 47: ...B205 ...
Page 48: ...48 C208 ...
Page 49: ...49 C209 ...
Page 50: ...50 D203 ...
Page 51: ...51 D300 ...
Page 52: ...52 D301 ...
Page 53: ...53 D302 ...
Page 54: ...54 D303 ...
Page 55: ...55 D304 ...
Page 56: ...56 D904 ...
Page 57: ...57 E11 ...
Page 58: ...58 E109 ...
Page 60: ...60 Notes ...