
A L P H A 2 5 0 0
D E S C R I P T I O N A N D U S E
CHAPTER
2- 17
677824
01/02
1
6
4
5
1
Individual spray section switches
2
Left boom tilt
3
4
8
3
7
2
Spray control lamp
Complete boom tiling
5
6
7
Spray on/off
Boom lowering
8
Boom lift
Complete boom tiling
9
Right boom tilt
9
2-
10-2
‘’JOYSTICK’’ DESCRIPTION
1- SET THE SWITCH TO ‘’ROAD SECURITY’’ TO OPERATES THE HYDRAULIC BOOM FUNCTIONS
2- THE PARALLELOGRAM IS EQUIPPED WITH LOCKING DECICE TO PREVENT THE LOWERING
OF THE BOOM DURING THE ROAD TRANSPORT. BEFORE UNFOLDING THE BOOM, PLEASE
CARRY OUT UNLOCKING PROCEDURE
12
11
10
13
14
Left outer section
10
11
Left inner section
12
13
14
Boom locking
Right inner section
Right outer section
Spray control
Hydraulic control
1
V
ALID
7
8
9
4
5
6
1
2
3
0
,
CE
TEST
VOLUME / HA PROGRAMME
VOLUME / HA
PROGRAMME
VIT.PRESS.
VOLUME / HA
DISTANCE
PARCOURUE
SURFACE
VOLUME
EPANDU
PARCELLES
AU
T
O
MANUEL
CIRCUL.
CONT
.
DEF
A
U
T
HARDI
VOLUME / HA MESURE
VITESSE
PRESSION
V
OLUME/HA
GR
OUPE
REGULOR
TWIN
RPM
+
-
REGULOR
S
E L E C T I O
N
N
E
R
A
L
'
A
R
R
E
T
AU
T
O
MANU