7
Install the center and bottom screws and washers.
Connect the supply hoses to the hot and cold supply
elbows.
Connect the supply hoses to the hot and cold inlet ports on
the valve.
Turn the water on at the main. Push the diverter stem up to
turn the water on to the panel.
Check all connections for leaks.