GB
Installation
Flash through the supply pipes.
Install box depending on the building application. The
box can be mounted of the wall with the special support
frame, with the 10 mm studs for the wall to the desired
position, or in the traditional brickwall installation.
Watch the depth of installation.
Large differences in pressure between the hot and cold
water supply should be balanced.
The hot water connection must always be LHS and the
cold water connection RHS. The mixed water outlets in
the top and bottom of the housing can be used singly
or jointly as required. For single connection the outlet
not in use must be properly sealed with a screw plug.
Stop valve(s) must be provided to control
the flow of mixed water from the outlet(s).
After completion the whole installation must be flashed.
To do this replace the backflow preventers by special
flush plugs and open the isolation valves. Afterwords
check the pipes and connections for leakage.
Final installation
Finish sets ½"
Mondaro
18376
Arco/Allegroh
16376
1901
19376
Carlton
17376
Uno
13176
Mondial
15376
Metropol
14376
Philippe Starck
10376
Allegroh Novo
36376
Steel
35376
Azzur
34376
Finish sets ¾"
Mondaro
18378
Arco/Allegroh
16378
1901
19378
Carlton
17378
Uno
13178
Mondial
15378
Metropol
14378
Philippe Starck
10378
Allegroh Novo
36378
Steel
35378
Azzur
34378
Initial use
After completition of the wall surface and installation of
the take off fittings, the front plate of the box must be
removed and the box has to be shortened to the front
edge of the tiles (seal with silicone.) When used in
hollow wall installation seal the edge to the gipsom
board. Put on sleeve and cover plate; mount setting
knob in position 38° and tighten screw.
Adjustment
Correction is necessary if the temperature measured at
the take off point differs from the temperature set on the
scale. To adjust temperature proceed as follows: Turn
the setting knob until water at a temperature of 38° C
comes out of the outlet. Loosen screw of setting knob.
Remove setting knob and turn to the 38° C position.
Attach setting knob again and tighten its screw.
Temperature limitation
The temperature range is limited by the safety check to
38° C. If a higher temperature is required, it is possible
to override the 38° C check by depressing the red safety
button.
Maintenance
Shut of hot and cold water supply.
Put setting knob to 38° C and hold in position.
Undo screw and pull off setting knob.
Remove sleeve and cover plate.
Unscrew thermoelement.
Unscrew N. R. valves, check and clean filters.
Check all components, clean, renew if necessary and
lubricate with special valve grease.
Re-assemble in reverse order.
Adjust unit.
Only original replacement parts may be used.
Important!
In the event of frost hazard and draining the pipes, the
isolation valves must be opened and the N. R. valves
must be removed.