background image

  

PLAN AHEAD

Site Selection

l

Avoid  overhanging  trees  as  much  as  possible  as  leaves  will  make  regular  cleaning

necessary and broken branches are a potential hazard.

l

Small trees,bushes or fences nearby can be helpful,acting as a wind break.

Site Preparation

The  site  must  be prepared  so  that the base of  the  shed  is  level  all  round  and checking
with a spirit level is required.

The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.

The shed is not designed to be built onto lawn directly

.

Also the

ground will get muddy during rainy days.

If  a  concrete  pad  is  made,it  is  important  that  this  slopes  towards  the  edges  to  prevent

water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.

Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.

The  bricks or blocks  should be  cemented  onto  firm and  level  concrete  footings  and the
greenhouse frame drilled and screwed to the base.

IMPORTANT NOTES:

l

Find  someone  to  help  you:it  is  much  easier  with  someone  to  hold  parts,pass  tools

ect.Also  some  steps  require  two  people  to  lift  structures  together.This  is  not  very

heavy work so would suit most able-bodied people.

l

Allow  plenty  of  time:rushing  often  causes  errors  and  the  re-doing  of  incorrect

assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.

l

Have the right tools to hand.

l

Safety clothing as recommended in the 'Tools' section.

l

Ideally  lat  out  the  parts  and  check  that  all  are  present  before  commencing

construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.

l

Tighten  all  nuts  carefully,being  sure  not  to  miss  any.Check  the  frame  is  square  and

using a spirit level to check that it is upright.

sharp edges

when assembling or performing.

wear work gloves, long sleeves and eye glasses,

Pay attention to the sharp edges. Please

Summary of Contents for HANAPEXSHD-GW

Page 1: ...WNER S MANUAL Instructions for Assembly Quick Easy Assembly Ridge Reinforced Walls 9820007 Requires two people take at least 2 3 hours for installation Overall Size L89 x W153 x H178cm Overall Size L2...

Page 2: ...ave all the necessary parts for the building Separate contents of the carton by the part number while reviewing parts list Familiarize yourself with the hardware and fasteners for easier use during co...

Page 3: ...or blocks should be cemented onto firm and level concrete footings and the greenhouse frame drilled and screwed to the base IMPORTANT NOTES l Find someone to help you it is much easier with someone t...

Page 4: ...2 2 6 B6 J1 4 4 GC GE 2 PART NO Qty 2 GJ W1 1 1355mm 53 34 2 40 637mm 25 07 2 41 752mm 29 6 1394mm 54 9 766mm 30 15 572mm 22 51 1583mm 62 3 876mm 34 5 760mm 29 92 1583mm 62 3 1583mm 62 3 1583mm 62 3 8...

Page 5: ...9 13 13 B1 B1 Q H 4L 4R P1 P1 P1 P4 P4 P4 P4 20 P6 P5 P6 P5 15 15 17L 17R 17L 17R GE GE GC GC GC GC GJ GJ J1 J1 W1 40 40 41 41 B6 29 29 29 29 29 1 29 1 29 1 29 1 D1 30 30 30 30 31 GB 34 33 32 H2 H2 B6...

Page 6: ...6 1 PART NO Qty 2 1 1 2 3 2 3 1 1 PART NO Qty J1 4 F1 1 equal the frame is square 2 The Floor Frame must be BOTH square AND level or the holes will not line up properly J1 J1 3 F1 8 F1 16 Base Assemb...

Page 7: ...nstallation 7 PART NO Qty F1 S3 P4 1 PART NO Qty P1 3 F1 S3 F2 S3 PART NO Qty P4 1 F1 S3 F2 S3 3 3 3 P4 P1 P1 P1 P4 F1 3 S3 3 F1 12 S3 15 F2 3 F1 4 S3 5 F2 1 Right Side Wall Panel Installation Back Wa...

Page 8: ...F1 S3 PART NO Qty P4 1 PART NO Qty P4 1 F1 S3 F2 S3 F1 S3 F1 S3 F2 S3 PART NO Qty 1 4L 1 4R F1 S3 F1 F1 S3 F1 S3 F2 4L 4R 3 3 3 P4 P4 F1 4 S3 5 F2 1 F1 4 S3 5 F2 1 F1 4 S3 4 F2 2 Door Posts Installati...

Page 9: ...1 Q F1 F1 S3 Q PART NO Qty 1 H H F1 F1 S3 F1 2 GJ H GJ F1 14 S3 14 F1 4 S3 4 F1 19 S3 15 Left and Right Upper Beam Installation Triangle Panel Installation Back Upper Beam Installation Tools Hook Inst...

Page 10: ...Roof Beam Installation Roof Beam Assembly 10 PART NO Qty 2 13 F1 13 13 PART NO Qty 2 B1 F1 F1 F1 S3 F1 S3 PART NO Qty P5 P6 1 1 B1 B1 13 F1 S3 P5 P6 F1 4 F1 12 S3 8 F1 14 S3 14 Roof Panels Instllation...

Page 11: ...P6 F1 S3 PART NO Qty 1 20 17L 17R 2 2 17R 17L 17R 17L 20 F1 F1 S3 PART NO Qty 4 GC GE 2 2 15 17L 17R GC F1 F1 GE GE GE GC GC GC GC 15 15 20 F1 14 S3 14 F1 4 F1 10 S3 4 Roof Cover Installation Eaves a...

Page 12: ...4 29 1 4 30 29 29 1 30 x4 F1 PART NO Qty D1 1 1 31 1 32 32 31 D1 F2 S3 F1 S3 F2 S3 32 31 D1 F1 32 S3 2 F2 2 PART NO Qty S3 14 F2 2 F1 12 Corner Connector Installation Door Panels Connection Door Panel...

Page 13: ...NO Qty D1 1 1 33 1 34 F1 S3 F2 S3 34 33 D1 F2 S3 34 33 D1 13 PART NO Qty 1 40 1 41 3 B6 F3 40 41 S3 2 F2 2 F3 6 F1 16 PART NO Qty S3 14 F2 2 F1 12 Reinforcement Installation and Screws Tightening Rig...

Page 14: ...tallation uninstallation right now 14 PART NO Qty 1 GB H2 2 F1 F1 F3 GB H2 H2 PART NO Qty 1 40 1 41 3 B6 F3 40 41 F1 8 F3 12 F3 F1 6 16 Reinforcement Installation and Screws Tightening Doors Installat...

Page 15: ...15 PART NO Qty W1 1 1355mm W1 3 W1 Fundation Installation...

Reviews: