background image

  

BEFORE YOU START

Owner's Manual

Prior  to  installation,  it  is  important  that  you  contact  your  local  government  authority  to

determine  if  building  approval  is  required.  Study  and  understand  this  owner's  manual.

Important  information  and  helpful  tips  will  make  your  construction  easier  and  more

enjoyable.

Assembly instructions

Instructions  are  supplied  in  this  manual  and  contain  all  appropriate  information  for  your
building  model.  Review  all  instructions  before  you  begin.  During  assembly,  follow  the

step sequence carefully for correct results .Please be aware: 

this unit takes two people

about one full day to complete

.

Parts

Check to be sure that you have all the necessary parts for the building.

      Separate contents of the carton by the part number while reviewing parts list.

  Familiarize  yourself  with  the  hardware  and  fasteners  for  easier  use  during

construction. These are packaged within the carton. Note that extra fasteners have been
supplied for your convenience.

TOOLS MAY REQUIRED

Use heavy duty gloves when handling steel sheets and flashing

PLAN AHEAD

Watch the weather:

Please be sure the day you select for installation is dry and calm.

DO  NOT

 

attempt  to  assemble  your  shed  in  windy  weather

because of risk of damage to panels, or personal injury. Be careful

of wet or muddy ground.

Teamwork:

Whenever  possible,  two  or  more  people  should  work  together  to
assemble  the  building.  One  person  can  position  parts  or  panels
while the other is able to handle the fasteners and the tools.

3M

1/10"

1/5"

5/16"

Summary of Contents for HANAPEXSHD-GW

Page 1: ...WNER S MANUAL Instructions for Assembly Quick Easy Assembly Ridge Reinforced Walls 9820007 Requires two people take at least 2 3 hours for installation Overall Size L89 x W153 x H178cm Overall Size L2...

Page 2: ...ave all the necessary parts for the building Separate contents of the carton by the part number while reviewing parts list Familiarize yourself with the hardware and fasteners for easier use during co...

Page 3: ...or blocks should be cemented onto firm and level concrete footings and the greenhouse frame drilled and screwed to the base IMPORTANT NOTES l Find someone to help you it is much easier with someone t...

Page 4: ...2 2 6 B6 J1 4 4 GC GE 2 PART NO Qty 2 GJ W1 1 1355mm 53 34 2 40 637mm 25 07 2 41 752mm 29 6 1394mm 54 9 766mm 30 15 572mm 22 51 1583mm 62 3 876mm 34 5 760mm 29 92 1583mm 62 3 1583mm 62 3 1583mm 62 3 8...

Page 5: ...9 13 13 B1 B1 Q H 4L 4R P1 P1 P1 P4 P4 P4 P4 20 P6 P5 P6 P5 15 15 17L 17R 17L 17R GE GE GC GC GC GC GJ GJ J1 J1 W1 40 40 41 41 B6 29 29 29 29 29 1 29 1 29 1 29 1 D1 30 30 30 30 31 GB 34 33 32 H2 H2 B6...

Page 6: ...6 1 PART NO Qty 2 1 1 2 3 2 3 1 1 PART NO Qty J1 4 F1 1 equal the frame is square 2 The Floor Frame must be BOTH square AND level or the holes will not line up properly J1 J1 3 F1 8 F1 16 Base Assemb...

Page 7: ...nstallation 7 PART NO Qty F1 S3 P4 1 PART NO Qty P1 3 F1 S3 F2 S3 PART NO Qty P4 1 F1 S3 F2 S3 3 3 3 P4 P1 P1 P1 P4 F1 3 S3 3 F1 12 S3 15 F2 3 F1 4 S3 5 F2 1 Right Side Wall Panel Installation Back Wa...

Page 8: ...F1 S3 PART NO Qty P4 1 PART NO Qty P4 1 F1 S3 F2 S3 F1 S3 F1 S3 F2 S3 PART NO Qty 1 4L 1 4R F1 S3 F1 F1 S3 F1 S3 F2 4L 4R 3 3 3 P4 P4 F1 4 S3 5 F2 1 F1 4 S3 5 F2 1 F1 4 S3 4 F2 2 Door Posts Installati...

Page 9: ...1 Q F1 F1 S3 Q PART NO Qty 1 H H F1 F1 S3 F1 2 GJ H GJ F1 14 S3 14 F1 4 S3 4 F1 19 S3 15 Left and Right Upper Beam Installation Triangle Panel Installation Back Upper Beam Installation Tools Hook Inst...

Page 10: ...Roof Beam Installation Roof Beam Assembly 10 PART NO Qty 2 13 F1 13 13 PART NO Qty 2 B1 F1 F1 F1 S3 F1 S3 PART NO Qty P5 P6 1 1 B1 B1 13 F1 S3 P5 P6 F1 4 F1 12 S3 8 F1 14 S3 14 Roof Panels Instllation...

Page 11: ...P6 F1 S3 PART NO Qty 1 20 17L 17R 2 2 17R 17L 17R 17L 20 F1 F1 S3 PART NO Qty 4 GC GE 2 2 15 17L 17R GC F1 F1 GE GE GE GC GC GC GC 15 15 20 F1 14 S3 14 F1 4 F1 10 S3 4 Roof Cover Installation Eaves a...

Page 12: ...4 29 1 4 30 29 29 1 30 x4 F1 PART NO Qty D1 1 1 31 1 32 32 31 D1 F2 S3 F1 S3 F2 S3 32 31 D1 F1 32 S3 2 F2 2 PART NO Qty S3 14 F2 2 F1 12 Corner Connector Installation Door Panels Connection Door Panel...

Page 13: ...NO Qty D1 1 1 33 1 34 F1 S3 F2 S3 34 33 D1 F2 S3 34 33 D1 13 PART NO Qty 1 40 1 41 3 B6 F3 40 41 S3 2 F2 2 F3 6 F1 16 PART NO Qty S3 14 F2 2 F1 12 Reinforcement Installation and Screws Tightening Rig...

Page 14: ...tallation uninstallation right now 14 PART NO Qty 1 GB H2 2 F1 F1 F3 GB H2 H2 PART NO Qty 1 40 1 41 3 B6 F3 40 41 F1 8 F3 12 F3 F1 6 16 Reinforcement Installation and Screws Tightening Doors Installat...

Page 15: ...15 PART NO Qty W1 1 1355mm W1 3 W1 Fundation Installation...

Reviews: