Hanna Instruments HI1006-18 Instruction Manual Download Page 3

Preliminary Examination

1.  PRELIMINARY EXAMINATION

Remove the probe from the packing and examine it carefully. 
Remove the sensor's protective cap before use.
Each probe is supplied with quick reference guide with probe quality certificate.

Note

: Save all packing material until you are sure that the probe works correctly. Any damaged or defective item 

must be returned in its original packing material with the supplied accessories.

2.  SAFETY MEASURES

General Safety & Installation Recommendations

•  Electrical connection, installation, operation, and maintenance must be carried out by specialized 

personnel only. 
The specialized personnel must read, understand, and adhere to the instructions in this manual. 

•  Before connecting the probe to the process controller, disconnect the controller from the power line.
•  User serviceable connections are all accessible inside controller’s enclosure.
•  Before powering the controller, verify the probe wiring has been done following the instructions 

detailed in this manual.

3.  GENERAL DESCRIPTION & INTENDED USE

Hanna Instruments

®

 has designed an extensive range of flat surface, industrial pH probes intended for industrial 

process control when teamed up with the 

HI510

 Universal Process Controller.

• 

HI1006-18

 and 

HI1016-18

 series designed for low conductivity or 

low-temperature

 process environments 

• 

HI1006-38

 and 

HI1016-38

 series designed for extended pH range or 

high-temperature

 process environments 

• 

HI1006-48

 and 

HI1016-48

 series designed for process environments where 

hydrofluoric acid

 is present 

An integral 

temperature sensor 

measures water temperature and adjusts the probe signal over the specified 

temperature range.
The 

flat tip

 eliminates deposits that can foul the sensor and significantly reduces necessary maintenance. 

The

 PVDF 

body material is easy to clean and disinfect, and resistant to most chemicals (e.g. solvents, sodium 

hypochlorite), ultraviolet light, and fungal growth.
Suitable for continuous measurement of pH required in applications such as urban wastewater treatment, 
industrial effluent treatment, and surface water monitoring, the probe (and accessories) can be installed directly 
in-line, immersed in a tank, or in a flow cell. 
The probe is available with an 

integral connector

 that permits connections with no twisted cables as cables 

are connected after installation.

Patch cables

 may be purchased separately to connect between the probe and controller up to 50 meters (164 ft).

Summary of Contents for HI1006-18

Page 1: ...rature Industrial Smart Probes SN XXXXXXXXXXXX pH 0 12 T 5 to 80 C p max 6 bar HI1006 1805 SN XXXXXXXXXXXX pH 0 12 T 5 to 80 C p max 6 bar HI1006 1800 Please scan the QR code or follow the link to dow...

Page 2: ...ssories 13 13 Abbreviations 14 Certification 14 Recommendations for Users 14 Warranty 14 Dear Customer Thank you for choosing a Hanna Instruments product Please read this instruction manual carefully...

Page 3: ...trial pH probes intended for industrial process control when teamed up with the HI510 Universal Process Controller HI1006 18 and HI1016 18 series designed for low conductivity or low temperature proce...

Page 4: ...uoride resistant HF glass sensor titanium matching pin 5 0 to 60 0 C 23 0 to 140 0 F 0 00 to 10 00 pH 8 Smart probe with RS485 connection zz 00 supplied with DIN connector without cable See Accessorie...

Page 5: ...controller setting Temperature compensation Automatic 0 0 to 80 0 C 32 0 to 176 0 F Temperature source Automatic from Probe Manual Body PVDF Junction PTFE Sensor Body LT glass Tip shape flat self cle...

Page 6: ...ations Probes are easily installed using the 3 4 NPT external thread Hand tighten the probe in position Then depending on the process tighten one or two turns with a wrench to secure in place Do not e...

Page 7: ...quire that saddle and flow cell are completely filled with water In line mounting with probe saddle 1 2 4 3 5 Note Probe can be rotated to prevent air entrapment inside the electrode Mounting accessor...

Page 8: ...enance and replacement B Slide out the electrode holder cap 3 C Screw the probe into the internally threaded protective cap 9 step I D Screw the probe and protective cap subassembly onto the holder 5...

Page 9: ...sediment or other foreign material to accumulate within the sensing area TANK VALVE 1 VALVE 2 FLOW FLOW INCOMING FLOW EXIT FLOW 3 1 2 4 5 7 6 6 FLOW CELL 1 Process controller 2 Wiring cable 3 pH prob...

Page 10: ...tor and attach ground lead g COMM B A IN1 IN2 A01 A02 A03 A04 PROBE B A PROBE B A A B Probe cabling color code Marking Attached cable Patch cable Functionality GREEN BLACK 0V B WHITE WHITE RS485 D A Y...

Page 11: ...CFM to save Wait followed by Calibration point is accepted and saved is displayed after the calibration point has been saved and accepted 5 Select Next to continue with a two point calibration 6 Repea...

Page 12: ...ubbles inside the glass bulb If the bulb and or junction are dry soak the electrode in HI70300 Storage solution for at least 30 minutes To ensure a quick response time the glass bulb and the junction...

Page 13: ...L Oil and fat cleaning solution 230 or 500 mL Other Accessories HI60501 PVC immersion electrode holder HI60503 PVDF immersion electrode holder HI60501 0 O rings for HI60501 electrode holder HI605011 P...

Page 14: ...roduced by the user to the supplied equipment may degrade its performance Do not use or store the product in hazardous environments WARRANTY The probes are warrantied for six months against defects in...

Reviews: