background image

PHOENIXNRG STREAMLINER INSTALLATION GUIDE

3

hanleyledsolutions.com  |  800.542.9941

Packaging for tubes 72” and under 

Streamliner Tube

Streamliner Tube

Streamliner Tube

in box

Streamliner Tube

in box

Boxes placed

in a case

10 Streamliner tubes per layer, 50 Tubes per case

Packaging for tubes 84” and larger

Boxes placed

in a case

5 Streamliner tubes per layer,

25 Tubes per case

Item

Tubes per box

Tubes per case

HPEB-SL2S24

1

50

HPEB-SL2S30

1

50

HPEB-SL2S36

1

50

HPEB-SL2S42

1

50

HPEB-SL2S48

1

50

HPEB-SL2S60

1

50

HPEB-SL2S64

1

50

HPEB-SL2S72

1

50

HPEB-SL2S84

1

25

HPEB-SL2S96

1

25

HPEB-SL2S108

1

25

HPEB-SL2S117

1

25

HPEB-SL2S120

1

25

NOTE:

 

All materials removed must be disposed 

of in accordance with applicable local, state, 

and federal laws.

WARNING Check Polarity:

All connections must be WHITE-TO-RED (+) 

and BLACK-TO-BLACK (-). Reverse polarity 

connections may damage the LEDs and will void 

product warranty. 

Caution: 

Turn off power to sign before inspecting

or removing existing light source. Power must 

remain off while installing the Concorde

Cabinet System.

PLG Exhibit 2053 

Grimco, Inc. v. Principal Lighting Group, LLC 

IPR2021-00968 

Page 2

Summary of Contents for PHOENIXNRG STREAMLINER

Page 1: ...G STREAMLINER INSTALLATION GUIDE 1 hanleyledsolutions com 800 542 9941 9 30 ideal overall depth LM79 LM80 L70 5 YEARS 09 22 2021 PLG Exhibit 2053 Grimco Inc v Principal Lighting Group LLC IPR2021 0096...

Page 2: ...escent Lamps are used Premium HanleyLED quality with 7 year product warranty when used with Hanley Surge Protector HanleyPRO Layout Creator at hanleyledsolutions com READ THESE INSTRUCTIONS COMPLETELY...

Page 3: ...SL2S42 1 50 HPEB SL2S48 1 50 HPEB SL2S60 1 50 HPEB SL2S64 1 50 HPEB SL2S72 1 50 HPEB SL2S84 1 25 HPEB SL2S96 1 25 HPEB SL2S108 1 25 HPEB SL2S117 1 25 HPEB SL2S120 1 25 NOTE All materials removed must...

Page 4: ...isconnect and remove the neon transformers or fluorescent ballasts Remove existing neon and standoffs or fluorescent lamps Inspect all sockets for signs of damage Replace any damaged sockets Reconnect...

Page 5: ...damage Openings smaller than diameter may be sealed with the appropriate amount of rated caulk or sealant Openings larger than should be patched using an aluminum or zinc coated steel patch with rive...

Page 6: ...4 26 22 3900 57 HPEB SL2S64 F64HO 16 28 24 4200 61 1 HPEB SL2S72 F72HO 18 31 26 4650 69 HPEB SL2S84 F84HO 20 37 32 5550 81 HPEB SL2S96 F96HO 22 42 36 6300 93 HPEB SL2S108 F108HO 26 47 40 7050 105 HPEB...

Page 7: ...3 Leave fluorescent sockets in raceway Inspect the sockets Ensure that they are clean and free of any damage Replace any damaged or compromised sockets to ensure that they do not damage Streamliners...

Page 8: ...nput L line from primary to all wires coming from sockets on one side of cabinet and N neutral line from primary to all wires coming from the sockets on the other side of the cabinet Install Streamlin...

Page 9: ...EDs is weak or uneven LED diodes inside modules malfunction Replace with new modules or new product Power input of driver is insufficient Replace with new product LEDs are blinking Driver inside the p...

Reviews: