USER MANUAL
│
J1250
1.3 Precautions when installing the product
1.3.1 Installation
This equipment is installed on a flat concrete floor and is used by balancing it with 6 balancing
feet on the corners of the iron H-beam base at the bottom of the main body. For more reliable
use, it can be operated by driving anchor bolts into the floor. When installing this equipment, it is
recommended to proceed after sufficiently consulting with the technical person in charge of the
manufacturer.
In the installation space, a work space of 60cm or more must be secured on the left, right, and
rear of the equipment, and sufficient space must be secured in the front.
Bowl body
> > Precautions
Bowl configuration and configuration with the main body
-
Serial No. is engraved on each of the 3 parts of
the bowl as shown in the picture on the right.
-
Bowls must be configured in one set
with the same Serial No. for the best
operation, so never mix them.
-
The sticker shown on the right is attached to
the outer surface of the main body, and the
Serial No. Use bowl sets from xxxxxx.
T
riangular rotor blades
bowl cap
/ WARNING /
For optimal use, this product
Serial No. xxxxxx Bowl Setwith
use it.
inquiry :
1.3.2 Electrical installation work
This equipment requires a 3-phase 4-wire 380V power supply, so electrical work is required
before installation.
-
The control unit should be located where it is easy to operate.
-
For electrical wiring and outlet specifications, be sure to inquire with the manufacturer
before installing the power supply.
1.3.3 Flexible tube
- Use flexible tube for piping for feed sample.
- If the supply pipe and sample collection container are located in the front, it may cause
inconvenience to work and movement, so be sure to place them on the left or right side.
- Select and use a pump suitable for the supply pressure. (Refer to p18~19)