
45
Hangar 9 P-51 Mustang 60 ARF Assembly Manual
Step 23
Slide the wire into the pushrod tube from the front of the
fuselage. Connect the Z-bend to the carburetor arm.
Hint
: You may need to remove the carburetor arm from
the carburetor. If so, make sure it is installed to provide
equal throw from open to closed.
Step 24
Thread the clevis back on the wire and connect it to the
servo arm in the hole that worked best for your throttle
operation. Slide the safety tubing over the clevis to prevent
it from opening accidentally. Use medium CA to glue the
plywood pushrod support to the fuselage in a position that
will provide smooth movement of the throttle pushrod.
Note
: If you are installing a glow-powered 4-stroke you
can skip to the section on installing the cowling.
Saito FG-20 Ignition
Component Installation
Required Parts
Fuselage assembly
Ignition module
Ignition battery
Switch harness
Tie wrap, 12-inch (305mm) (4) (not included)
1/4-inch (6mm) foam (not included)
Tools and Adhesives
Drill
Hobby knife with #11 blade
Drill bit: 1/4-inch (6mm)
Step 1
Prepare the top of the radio box by using your battery as
a guide and drilling four holes in the box using a drill and
1/4-inch (6mm) drill bit. You will also need to make a slot to
pass the lead from the battery through as well.
Step 2
Wrap the ignition battery in 1/4-inch (6mm) foam. Secure
the battery to the top of the radio box using two 12-inch
(305mm) tie wraps.
Step 3
Mount the switch for the ignition on the side of the fuselage
opposite that of the radio switch. Mounting the switch
follows the same procedure as the radio switch.