-5-
Model Number ______________________________________________
Serial Number ______________________________________________
Dealer’s Name _________________________________________________________________
Inspection Date _____________________________________________
Signature of Pre-Delivery Inspector _________________________________________________
Big Dog
was not damaged in shipment. Check for dents and loose or missing parts.
Report damage immediately to H&S Manufacturing Co., Inc.
Big Dog
has been correctly assembled according to instructions in this manual.
Wheel nuts and all other fasteners are tightly secured.
All bolts and fasteners are tight.
All shields and guards are in place and fastened.
All grease fittings have been lubricated. Both final drive assemblies are at proper gear lube
level in site glass. (See Lubrication Chapter in this manual).
Hoses and fittings are properly attached and there are no visible leaks.
All mechanisms are operating trouble-free.
Final drive chains are at proper tension.
Apron chains are adjusted properly.
Decals are in place and legible.
AFTER COMPLETION, DEALER SHOULD REMOVE AND RETAIN FOR RECORDS
DEALER PRE-DELIVERY CHECKLIST
After the
Big Dog
has been completely set up, check to be certain it is in correct operating order
before delivering to the customer. The following is a list of points to inspect. Check off each item as
you have made the proper adjustments and found the item operating satisfactorily.
(Remove Dealers File Copy
At Perforation)
Summary of Contents for 1126
Page 3: ...1...
Page 5: ...3 Remove Copy At Perforation...
Page 6: ...4 Intentionally Left Blank...
Page 8: ...6 Intentionally Left Blank...
Page 10: ...8 Intentionally Left Blank...
Page 13: ...11 SAFETY INFORMATION...
Page 15: ...13...
Page 27: ...25 DECAL LOCATION BBSTMS19 66256 66258 73004 Grain Hopper 1906E 66257 093020 093020...
Page 28: ...26 SERVICE NOTES...
Page 29: ......