Hamworthy PUREWELL VariHeat c Installation Instructions Manual Download Page 5

HAMWORTHY HEATING LTD                                           Page                                                                                  500005151/B 

 

 

 

Figure 1 - Reverse Return Assembly - General Overview 
(PV70c, 95c, 110c  2 Boiler Assembly shown) 

1.0  GENERAL INSTRUCTIONS 

 
These instructions MUST be read in conjunction 
with  the  Purewell  VariHeat  Installer’s  Guide 
(HHL  Part  No.  500001169  for  Condensing 
Models. 
 

SAFETY  NOTE:

  All  safety  instructions 

referred  to  in  the  Installer’s  Guide  must  be 
adhered to, and a competent person must carry 
out all works referred to in this instruction. 
 
These  header  kits  are  specifically  for  use  with 
Purewell VariHeat boilers. 
 
All sub assemblies are  pressure tested  prior  to 
despatch. 
 
 

 

 
NOTE: This water  header  kit  is  intended  for 
use as reverse-return.   

 

1.1 Delivery 

 
Remove  all  packing  material  and  referring  to 
Fig.  2  and  Table  1  inspect  the  equipment  to 
ensure  that  all  parts  are  present  and 
undamaged.  
 
If  in  any  doubt,  DO  NOT  USE  THE 
EQUIPMENT.  Instead,  contact  HHL  Technical 
Department. 
 
Familiarise yourself with the parts and how they 
assemble together by referring to Figure 1. 

Summary of Contents for PUREWELL VariHeat c

Page 1: ...IMPORTANT NOTE THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING COMMISSIONING OPERATING OR SERVICING EQUIPMENT PUREWELL VariHeat c REVERSE RETURN HEADER KITS INSTALLATION INSTRUCTIONS...

Page 2: ......

Page 3: ...STALLATION INSTRUCTIONS Purewell VariHeat Condensing Boilers Models PV 70c PV 95c PV 110c PV 140c PV 180c Consisting of 2 3 multiple boiler arrangement THESE INSTRUCTIONS MUST BE READ IN CONJUNCTION W...

Page 4: ...EMBLY 2 FIGURES 1 2 Boiler Water Pipe Assembly General Overview 1 2 Pipe kit Exploded View 2 2 2 1 Dimensional Overview 2 Boiler Model 70c 95c 110c 4 2 2 2 Dimensional Overview 2 Boiler Model 140c 180...

Page 5: ...mpetent person must carry out all works referred to in this instruction These header kits are specifically for use with Purewell VariHeat boilers All sub assemblies are pressure tested prior to despat...

Page 6: ...Remove all coverings of the pipes ensure all parts are there and still attached to the pallet and the separate parts such as the ball valve flexible hose etc and attach in the configuration shown 2 1...

Page 7: ...Using a suitably rated hoist raise the assembly to approximate finished height gently lower the hoist until the feet touch the floor adjust the feet using the hoist to take the weight till the flexibl...

Page 8: ...t access to the gas pipe is available 2 1 12 The assembly is now complete Test pipework for leaks then connect gas and water pipes to the gas supply and heating system NOTE The gas supply manifold pip...

Page 9: ...LTD Page 500005151 B 5 2 2 2 Dimensional Overview 2 Boiler Model 140c 180c 2 2 3 Dimensional Overview 3 Boiler Model 70c 95c 110c 140c and 180c Note Other Dimensions same as previous Boiler Arrangeme...

Page 10: ...ler build 40mm diameter plastic T junction not HHL supply 40mm diameter plastic tubing not HHL supply To drain From previous boiler NOTE Due to slightly acidic content of condensate HHL recommend that...

Page 11: ......

Page 12: ...les Service McDowall Modular Services 2 Penson Road Queenslie Industrial Estate Glasgow G33 4AG tel 0141 336 8795 fax 0141 336 8954 email MMS McDowallModularServices hamworthy heating com North East E...

Reviews: