HAMPTON BAY H27-LP10 Owners & Installation Manual Download Page 28

28

 | 

Hampton

®

 H27-10 Direct Vent Freestanding Gas Stove

 | 

28

installation

Offset Chart

Diagram 12

7)

  Ensure vent is vertical and secure the base 

of the flashing to the roof with roofing rails, 

slide storm collar over the pipe section and 

seal with a mastic.

8)

  Install the vertical termination cap by twist 

locking it.

Notes:

 

a)

   For  multistorey  vertical  installations, 

a  Ceiling  Fire  stop  is  required  at  the 

second floor, and any subsequent floor. 

Diagram 12.  The opening should be 

framed to 10 " x 10" inside dimensions, 

in the same manner as shown in diagram 

9. 

 

b)

  Any occupied areas above the first floor, 

including closets and storage spaces, 

through which the vertical vent passes, 

must be enclosed. 

Diagram 11

    Roof Pitch                   Minimum Vent Height
                                           Feet         Meters

flat to 7/12 

      0.61

over 7/12 to 8/12 

0.61

over 8/12 to 9/12 

0.61

over 9/12 to 10/12 

2.5 

0.76

over 10/12 to 11/12 

3.25 

0.99

over 11/12 to 12/12 

1.22

over 12/12 to 14/12 

1.52

over 14/12 to 16/12 

1.83

over 16/12 to 18/12 

2.13

over 18/12 to 20/12 

7.5 

2.29

over 20/12 to 21/12 

2.44

Diagram 8

3)

  To install the Round Support Box/Wall Thim

-

ble in a flat ceiling, cut a 10 inch square hole 

in the ceiling centred on the hole drilled in 

Step 2. Frame the hole as shown in diagram 

9.

NOTE: For best results and optimum perfor-

mance with each approved venting 

system, it is highly recommended to 

apply “Mill-Pac” sealant (supplied) to 

every inner pipe connection. Failure 

to  do  so  may  result  in  drafting  or 

performance issues not covered 

under warranty. 

4)

  Assemble the desired lengths of black pipe 

and  elbows necessary to reach from the 

appliance adapter up though the Round 

Support Box. Insure that all pipes and elbow 

connections  are  in  the  fully  twist-locked 

position and sealed.

Diagram 10: The upper half of the flashing is 

installed under the roofing material and not 

nailed down until the chimney is installed. This 

allows for small adjustments.

Note:  If an offset is necessary in the attic 

to avoid obstructions, it is important 

to support the vent pipe every 3 feet, 

to  avoid  excessive  stress  on  the 

elbows, and possible separation.  

Wall straps are available for this 

purpose.  See diagram 5. 

 

 

Galvanized pipe and elbows may be utilized 

in the attic as well as above the roofline.  

The galvanized finish is desirable above 

the  roofline  due  to  its  higher  corrosion 

resistance.

 

Continue to add pipe sections through the 

flashing  until  the  height  of  the  vent  cap 

meets the minimum height requirements 

specified  in  diagram  11  or  local  codes.  

Note that for steep roof pitches, the vertical 

height must be increased.  A poor draft, or 

down drafting can result from high wind 

conditions near big trees or adjoining roof 

lines, in these cases, increasing the vent 

height may solve the problem.

5)

  Cut a hole in the roof centred on the small 

drilled hole placed in the roof in Step 2. The 

hole should be of sufficient size to meet 

the minimum requirements for clearance 

to combustibles of 1-1/4". Slip the flashing 

under the shingles (shingles should overlap 

half the flashing) as per diagram 10.

6)

  Continue to assemble pipe lengths.

Diagram 9

Summary of Contents for H27-LP10

Page 1: ...mable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your bu...

Page 2: ...has been designed to provide you with all the warmth and charm of a wood fireplace at the flick of a switch The model H27 10 has been approved by Warnock Hersey Intertek for both safety and efficiency...

Page 3: ...System 21 DV Stove Horizontal Vent Kit 22 Residential And Manufactured Homes Mobile Homes 24 Minimum Horizontal Termination Installations 24 Dura Vent Termination Kit 25 Horizontal Terminations 26 Ve...

Page 4: ...ight Side Wall Vertical Pipe See Manual for details Model Modele H27 NG10 Model Modele H27 LP10 Part 919 485a Colour Everything black on grey except for items indicated as being printed in red Size Pr...

Page 5: ...directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT...

Page 6: ...6 Hampton H27 10 Direct Vent Freestanding Gas Stove 6 dimensions UNIT DIMENSIONS WITH VERTICAL VENTING 17 13 16 452 mm...

Page 7: ...Hampton H27 10 Direct Vent Freestanding Gas Stove 7 7 installation UNIT DIMENSIONS WITH HORIZONTAL VENTING 452 mm...

Page 8: ...alfirst Consult the building authority having jurisdiction to determine the need for a permit prior to starting the installation Note Failure to follow the instructions could cause a malfunction of th...

Page 9: ...f the appliance be kept clean and free from excessive lint from carpeting 4 See general construction and assembly in structions The appliance and vent should be enclosedwheninstalledinorpassingthrough...

Page 10: ...wall if installing the blower option so the fan can be easily installed and or serviced LOCATING YOUR GAS STOVE When selecting a location for your stove ensure that the clearances listed above are met...

Page 11: ...n the back of the left side access panel 7 Loosen the 2 bolts on fan assembly and slide the fan into the slots provided on the unit 8 Once the fan assembly is fitted into the assigned slots tighten th...

Page 12: ...e steps OPTIONAL WALL THERMOSTAT INSTALLATION 1 Open the front panel and remove the cover plate by removing two screws 2 Disconnect one of the wires from the switch as shown in the picture below to co...

Page 13: ...logy Co Axial system The inner liner vents products of combustion to the outside while the outer pipe draws outside combustion air into the combustion chambertherebyeliminatingtheneedtouseheated room...

Page 14: ...of center line extended above meter regulator assembly 36 90cm a J Clearance to service regulator vent outlet 36 90cm K Clearance to non mechanical air supply inlet to building or the combustion air...

Page 15: ...Adjustable Length 7 Black N A N A 4D7AB N A N A N A Extension Pipe 8 1 2 Galvanized 46DVA 08A N A N A N A N A N A Extension Pipe 8 1 2 Black 46DVA 08AB N A N A N A N A N A Adjustable Length 12 Galvani...

Page 16: ...Termination Kit A Disc 4DT HKA 4DHTK2 4DHTKA SV SHK TM4 HTK Horizontal Termination Kit B 46DVA KHA Changed Components 4DT HKB 4DHTK1 4DHTKB SV HK TM4 HTK Vertical Termination Kit Disc 4DT VKC 4DHTK 4...

Page 17: ...nt Direct Vent American Metal Products Ameri Vent Direct Vent Security Secure Vent Selkirk Direct Temp and ICC Excel AstroCapTM is a proprietary trademark of FPI Fireplace Products International Ltd D...

Page 18: ...m two 45o elbows If the vent is ENCLOSED in a chase min size 9 x 9 maintain a 1 1 4 clearance to combustibles May be installed in Manufactured Mobile Homes after first sale Horizontal Terminations for...

Page 19: ...of 8 feet total vertical and max 8 feet total horizontal Please note min 1 foot between 90o elbows is required With these options maxi mum total pipe length is 30 feet with minimum of 6 feet total ve...

Page 20: ...feet total horizontal Please note min 1 foot between 90o elbows is re quired Vent restrictor position A fully open refer to the Vent Restrictor Position section Lengths do not include elbow indicated...

Page 21: ...to be attached to two 3 76mm co linear aluminium flex running the full length of the chimney See the Venting Arrangements chart below for minimum and maximum flue lengths See chart below for minimumdi...

Page 22: ...th the starter collar and the 90o elbow Crimped section of rigid pipe seats into the 90o elbow Only cut the uncrimped side of pipe Dismantle all pipe sections including vent terminal 2 Assembleatrialf...

Page 23: ...and vinyl siding standoff to prevent water from entering and to make a tight seal between the cap and the standoff 7 Stretch the 4 dia flex liner out fully and get a trial fit of the liner onto the 4...

Page 24: ...rements Determine the minimum clearance to combustibles from the rear of the unit to the wall It is also important to note the wall thickness Before cutting the vent hole through the wall ensure that...

Page 25: ...ical to horizontal type installations Warning Alwaysmaintainrequired clearances air spaces to nearby combustibles to prevent a fire hazard Do not fill air spaces with insulation Theminimumclearancereq...

Page 26: ...enetrated is constructed of non combustible material i e masonry block or concrete a 7 diameter hole is acceptable a The horizontal run of vent should have a 1 4 inch rise for every 1 foot of run towa...

Page 27: ...dden on the final installation NOTE For best results and optimum performancewitheachapprovedventing system it is highly recommended to ap ply Mill Pac sealant supplied toevery inner pipe connection Fa...

Page 28: ...lt in drafting or performance issues not covered under warranty 4 Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance adapter up though the Round SupportBox Ins...

Page 29: ...y chimneys cleanout doors and caps or plugs for cleanout tee fittings and ash dumps shall be secured in place and sealed before install ing a Direct Vent system within the chimney If the appliance shu...

Page 30: ...Gas min 5 0 w c Propane min 12 0 w c Manifold Pressure Natural Gas 3 5 0 2 w c Propane 10 0 2 w c 8 Ensure vent is vertical and secure the base of the flashing to the roof with roofing rails slide sto...

Page 31: ...the valve 1 Make sure the valve is in the OFF position 2 Loosen the IN and or OUT pressure tap s turning counterclockwise with a 1 8 wide flat screwdriver 3 Attach manometer to IN and or OUT pres sure...

Page 32: ...ll off the pilot cap to expose the pilot orifice 6 Unscrew the pilot orifice with the allen key and replace with the LP pilot orifice in the kit and replace pilot cap 7 Remove burner orifice with a 1...

Page 33: ...and refer to the dia grams Ifthelogsarebrokendonotusetheunituntiltheyare replaced Broken logs can interfere with the pilot operation The gas log kit Part 350 930 contains the following a Rear Log b L...

Page 34: ...ftheburner in and around where the embers are placed Avoid stacking platinum embers 6 Place the center cross log D so it rests in the notch located on the top of the rear log position as shown below L...

Page 35: ...ck for proper draft CAUTION Anyalterationtotheproductthatcausessooting orcarboningthatresultsindamagetotheexterior faciaisnottheresponsibilityofthemanufacturer BACK UP BATTERY In the event of a power...

Page 36: ...ot surface and are away from sharp edges WARNING Electrical Grounding Instructions This appliance is equipped with a three pronged grounding plug for your protection against shock hazard and should be...

Page 37: ...Hampton H27 10 Direct Vent Freestanding Gas Stove 37 37 operating instructions WIRING DIAGRAM WITH THERMOSTAT Thermostat Optional Millivolt...

Page 38: ...ned Never operate the appliance with the glass removed 5 Verifythattheventingandcapareunobstructed 6 Verify log placement If the pilot cannot be seen when lighting the unit the logs have been incorrec...

Page 39: ...oard will go into lock out The system will need to be reset as follows a Wait 5 minutes turn the system off by pressing the ON OFF button on the remote b After approximately 2 seconds turn on ON OFF s...

Page 40: ...nsult a qualified installer service agency or gas supplier AVERTISSEMENT Quiconque ne respecte pas la lettre les instructions dans la pr sente notice risquede d clencher un incendie ou une explosion e...

Page 41: ...at different rates resulting in some cracking and ticking sounds will be heard throughout the cycling process WARNING CHILDRENANDADULTS SHOULD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERATUREAND...

Page 42: ...ocheckmechanicalsupportssuch as Wall Straps or plumbers tape for rigidity 5 Verify proper operation after servicing LOG REPLACEMENT Theunitshouldneverbeusedwithbrokenlogs Turn off the gas valve and al...

Page 43: ...o stove 4 Disconnect gas line to stove 5 Disconnect 3 8 NPT pipe from 90o elbow on valve or flex connector 6 Disconnect 3 wires from spark igniter assembly 7 Lift off the Cast Top and remove the Cast...

Page 44: ...ctor 350 004 Baffle Plate for Firebox Part Description Part Description Part Description 350 022 Casting Mount Bracket Fan Air Divider 50 W260260 Top Relief Frame Gasket 51 942 117 Top Relief Frame 52...

Page 45: ...Halogen Light Socket Assembly 910 997 Halogen Light Bulb 120 Volt 20 Watt JCD Bi Pin Gy6 35 910 157 P Blower Motor Only with Squirrel Cage 911 093 10 foot Extension Cord 911 027 Battery Holder W 9V Sn...

Page 46: ...46 Hampton H27 10 Direct Vent Freestanding Gas Stove 46 notes...

Page 47: ...d if requested It is the general practice of FPI to charge for larger higher priced replacement parts and issue credit once the replaced component has been returned to FPI and evaluated for manufactur...

Page 48: ...________________________________________________ Phone ____________________________________________________________ Date Installed _______________________________________________________ Serial No ___...

Reviews: