background image

PAGE    OF

REV.

BUL87343

A

4

ASSEMBLY INSTRUCTIONS

2

INSTRUCTIONS DE MONTAGE

H1

PRODUCT SERIES

SÉRIE DE PRODUIT

IMPORTANT SAFETY CAUTIONS

NOTE

: Read all instructions before installing and using the product.

LOADING RACK SYSTEM

NOTE

: When loading equipment into the

enclosure or rack system ensure weight is
distributed so that heavier loads are placed
towards the bottom of the rack to avoid
unstable conditions.

The following parts are not effectively bonded to the Protective Earth
Terminal (PET): Doors, Rails, Side Panels, Top and Bottom Panels. If
any part needs to be bonded to the PET it shall be done in accordance
with Article 250 of the National Electric Code.

To reduce risk of personal injury and product damage always ensure a
a sufficient amount of personnel are present when loading, unloading,
and moving the enclosure or rack system.

Evenly distribute all mounted loads and equipment to ensure stability
within the system.

Always fully mount and secure enclosure or rack system before loading
equipment.

Ensure unit is plumb and level for proper operation.

Route all chords and cables away from moving parts and all possible
pinch points.

Ensure that the floor/wall structure is able to withstand the weight of
the cabinet while fully loaded.

Installation and assembly must be performed by qualified personnel.

NOTE

: Seismic weight load rating is only

applicable when the rack has been secured
using the seismic bolt down kit: C4K-Z4

3000 lb

Maximum Weight Capacity:

1000 lb

IBC 2012 Zone 4 Seismic Rating:

Suitable for mounting on concrete or other noncombustible surface only.