6
ECOVENT Operating Instructions
ECO
V/1
120
12/re
v1/EN
Section 1 – Installation
1.5 Commissioning
Information:
1.5.1. Sequence of Operation. If all of the services have been
connected correctly, the sequence of operation is as follows.
Green illuminated on-off toggle switch will turn condensate hood
power on. At this time the fan will run at low speech (Idle). When
the door of the oven is opened, the magnetic reed switch triggers
the fan to increase in speed, and a cold water mist to be produced.
This will run for 24 seconds (factory setting) before returning to idle.
Closing the door will also return the condensate hood to idle.
Instruction:
1.5.2. Prior to running the condensate hood for the first time, ensure
that both the mesh moisture eliminator (5) and baffle filters (6) are
fitted. Ensure all services and drains have been connected as
described in section 1.4 and oven is switched off.
1.5.3. Turn power on via toggle switch. Fan will run. Open oven
door to confirm activation of reed switch and allow to run for the
full 24 seconds. (Until the water stops automatically.) Open and
close the door twice more (and run for the full 24 seconds), to
allow the weir in the base of the condensate hood to fill. The
condensate hood is now ready for use.