background image

7

OVLERQ*D  OVLSRQ*D  OVLESRQ*G  OVLSERQ*G

97881C - (Rev. E - 4/07)

5.

Install the frame squarely in wall

 opening with frame

upright edges flush with the finished wall surface.
Place shelf inside frame and line up the (2) holes on
each. Insert loose ends of rods into holes on sides of
shelf panel. Using appropriately sized screws or bolts

Legend

Item

Description

A

1/4” O.D. Tube - Water Outlet Connection

B

3/8” O.D. Tube - Water Inlet Connection

C

1-1/4” O.D. Waste Tube

D

Electrical Inlet on Chiller

Figure 11 – OVL-II ER-Q/SR-Q Rough-In Dimensions

(not provided), fasten the shelf and frame to the
bottom of wall opening. Secure the frame sides and
top to the wall opening using (10) 5/16” bolts or
screws (not provided).

NOTE:

Be sure that frame is squared in location. Do
not use less than the required screw quantity
and size.

MODEL OVL-ER

MODEL OVL-SR

Summary of Contents for OVL Series

Page 1: ...uture reference Service to be performed by authorized service personnel only INSTALLER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to availa...

Page 2: ...S S Strainer Plate A G Drain Gasket Packing Ring Drain Nut Friction Ring Drain Plug S S Drain Plug A G Drain Tube Drain Tube Waste Tube Gasket Slip Nut Regulator Regulator Holder Basin S S Basin A G...

Page 3: ...I SR A G Upper Panel OVL II SER S S Upper Panel OVL II SER A G Upper Panel OVL II ESR S S Upper Panel OVL II ESR A G Lower Panel OVL II ER SR S S Lower Panel OVL II ER SR A G Lower Panel OVL II SER ES...

Page 4: ...e a means for securing the frame assembly in place NOTE Building construction must allow for adequate air flow on both sides and top of remote chiller unit a minimum of 4 102 mm is required 3 Install...

Page 5: ...ll face Secure the frame to the wall through holes with 12 5 16 bolts or screws not provided Tighten securely NOTE Be sure that frame is squared in location Do not use less than required screw quantit...

Page 6: ...1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up to 150 lbs static load and provide a means for securing the frame assembly in pl...

Page 7: ...crews or bolts Legend Item Description A 1 4 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 O D Waste Tube D Electrical Inlet on Chiller Figure 11 OVL II ER Q SR Q Roug...

Page 8: ...as shown on preceding pages 2 Install chiller Remove front panel of chiller Remove and discard cardboard inner pack from between compressor and side panel Slide chiller onto the shelf and position it...

Page 9: ...the top actuator plates Figure 20 by removing the screws holding assembly together and adjust the screw on the regulator Item 14 Figs 21 22 Clockwise adjustment will raise stream height and counterclo...

Page 10: ...Quick Connect Water Fittings Cooler is provided with lead free connectors which utilize an o ring water seal To remove tubing from the fitting relieve water pressure push in on the gray collar while p...

Page 11: ...LESRQ G OVLSERQ G 97881C Rev E 4 07 Figure 22 Regulator Assembly Figure 23 Fountain Assembly Side View 23 14 24 REGULATOR MOUNTING BRACKET 15 7 18 10 6 5 See Fig 20 3 4 16 21 See Fig 22 32 8 17 12 13...

Page 12: ...OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G 97881C Rev E 4 07 2222 CAMDEN COURT OAK BROOK IL 60523 630 574 3500 PRINTEDINU S A FOR PARTS CONTACT YOUR LOCAL DISTRIBUTOR OR VISIT OUR WEBSITE WWW HALSEYTAYLOR...

Reviews: