background image

10

OVLERQ*D  OVLSRQ*D  OVLESRQ*G  OVLSERQ*G

97881C - (Rev. E - 4/07)

TROUBLESHOOTING & MAINTENANCE

Orifice Assembly:

 Mineral deposits on orifice can cause

water flow to spurt or not regulate. Mineral deposits may
be removed from the orifice by poking with a small round
file not over 1/8” diameter, or using a small diameter wire.

DO NOT

 file or cut orifice

material.

Stream Regulator: 

If orifice is clean, regulate flow as in

Step 10 of the installation instructions. If replacement is
necessary, see parts list for correct regulator part number.

Actuation of Quick Connect Water Fittings:

 Cooler is

provided with lead-free connectors which utilize an o-ring
water seal. To remove tubing from the fitting, relieve water
pressure, push in on the gray collar while pulling on the
tubing. (See Figure 19) To insert tubing, push tube
straight into fitting until it reaches a positive stop (approxi-
mately 3/4”).

To preserve the quality and keep
this AZTEC GOLD finish clean and
spot free, clean this surface with
only mild detergent or window
cleaner and polish with a soft
cloth.  DO NOT use any abrasive
cleaners or harsh chemicals.
They WILL damage the finish!

Figure 19 – Quick Connect Fittings

Figure 21 – Regulator Mounting Mechanism

Figure 20 – Push Arm Mechanism

28

22

29

26

Stream Height Adjustment

30

29

26

31

25

27

Summary of Contents for OVL Series

Page 1: ...uture reference Service to be performed by authorized service personnel only INSTALLER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to availa...

Page 2: ...S S Strainer Plate A G Drain Gasket Packing Ring Drain Nut Friction Ring Drain Plug S S Drain Plug A G Drain Tube Drain Tube Waste Tube Gasket Slip Nut Regulator Regulator Holder Basin S S Basin A G...

Page 3: ...I SR A G Upper Panel OVL II SER S S Upper Panel OVL II SER A G Upper Panel OVL II ESR S S Upper Panel OVL II ESR A G Lower Panel OVL II ER SR S S Lower Panel OVL II ER SR A G Lower Panel OVL II SER ES...

Page 4: ...e a means for securing the frame assembly in place NOTE Building construction must allow for adequate air flow on both sides and top of remote chiller unit a minimum of 4 102 mm is required 3 Install...

Page 5: ...ll face Secure the frame to the wall through holes with 12 5 16 bolts or screws not provided Tighten securely NOTE Be sure that frame is squared in location Do not use less than required screw quantit...

Page 6: ...1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up to 150 lbs static load and provide a means for securing the frame assembly in pl...

Page 7: ...crews or bolts Legend Item Description A 1 4 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 O D Waste Tube D Electrical Inlet on Chiller Figure 11 OVL II ER Q SR Q Roug...

Page 8: ...as shown on preceding pages 2 Install chiller Remove front panel of chiller Remove and discard cardboard inner pack from between compressor and side panel Slide chiller onto the shelf and position it...

Page 9: ...the top actuator plates Figure 20 by removing the screws holding assembly together and adjust the screw on the regulator Item 14 Figs 21 22 Clockwise adjustment will raise stream height and counterclo...

Page 10: ...Quick Connect Water Fittings Cooler is provided with lead free connectors which utilize an o ring water seal To remove tubing from the fitting relieve water pressure push in on the gray collar while p...

Page 11: ...LESRQ G OVLSERQ G 97881C Rev E 4 07 Figure 22 Regulator Assembly Figure 23 Fountain Assembly Side View 23 14 24 REGULATOR MOUNTING BRACKET 15 7 18 10 6 5 See Fig 20 3 4 16 21 See Fig 22 32 8 17 12 13...

Page 12: ...OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G 97881C Rev E 4 07 2222 CAMDEN COURT OAK BROOK IL 60523 630 574 3500 PRINTEDINU S A FOR PARTS CONTACT YOUR LOCAL DISTRIBUTOR OR VISIT OUR WEBSITE WWW HALSEYTAYLOR...

Reviews: