![Halsey Taylor HTHB-OVLSEBP-I Owner'S Manual Download Page 3](http://html1.mh-extra.com/html/halsey-taylor/hthb-ovlsebp-i/hthb-ovlsebp-i_owners-manual_3472743003.webp)
0000001032 (Rev. A - 10/13)
HTHB-OVLSEBP-I HTHBWF-OVLSEBP-I
Page 3
Figure 3 - HTHBWF-OVLSEBP-I Tube Routing
REQUIRED TOOLS AND MATERIALS
These tables show special tools and/or additional materials
(not provided) which are necessary to complete installation
of these units:
12
12
28
TO BUBBLER
12
Figure 2 - HTHB-OVLSEBP-I Tube Routing
TO BUBBLER
16
FILTER
ASSEMBLY
13
12
12
WATER
INLET
Special Tools
Item
Description
Quantity
NONE
Additional Materials Not Included
Item
Description
Quantity
Unplated copper inlet pipe
Service Stop/Shut-off Valve
90° 1-1/4” Drain Line
1-1/4” Tee Drain Line
1
2
3
4
1
1
1
1
WATER
INLET
TO BUBBLER
28
27
TO BOTTLE
FILLER
TO BUBBLER
25
13
28
14
TO BOTTLE
FILLER
1.
Make
water supply connections (Fig 13). Install a shut-off
valve and union connection to building water supply (valve
and union not provided). Turn on water supply and flush
the line thoroughly.
Caution:
DO NOT SOLDER tubes inserted into the
strainer or filter head as damage to the o-rings may result.
2.
Install
mounting frame (instructions supplied with mounting
frame.
3.
(For HTHBWF-HRSEBP-I)
Install the filter head to the bracket,
then install filter bracket on mounting frame (Fig 12), plumb from
the filter outlet using the ¼” elbow, poly tubing and ¼ x ¼ x ⅜”
tee, install filter.
3a.
(For HTHB-HRSEBP-I)
Install 3/8” tee, poly tubing and strainer
per (Fig 2).
4.
Install
¼ x ¼ x ⅜ tee on building water supply tube. Install
supplied 4” poly tubing and armaflex to the outlet of the prev-
ously installed tee. Connect supplied ¼ x ¼ x ¼ tee to the 4” poly
tubing. With the back panel standing close to the frame, connect
3/8” poly tube to the bottle filler.
5.
Hang
main panel on mounting frame hanger. Make sure the
power cord, reset switch wire & poly tube do not get pinched
between the panel & mounting frame. Ensure the panel engages
at the top. Align fountain holes with mounting frame holes.
6.
Remove
protective coating from main panel.
7.
Install
fountains with (8) 5/16-18 HHMS (provided) (Fig 5).
Connect the ¼” water lines from each fountain to the remaining
openings on the tee at the remote chiller (cut lines to fit as
needed).
12