Page 9
1000001732 (Rev. D - 06/16)
HAC-HB*1B HAC-HB-NF-*1B
RE-PLUMBING TWO LEVEL STATION WATER CIRCUITS (WITH FILTER)
CAUTION:
•
This procedure MUST be performed on ALL TWO LEVEL HALSEY TAYLOR WATER COOLERS or the
bottle filling unit
WILL NOT perform properly!
•
When disconnecting water lines use a container to catch any water running out of the lines.
HAC HYDROBOOST TWO LEVEL PLUMBING
STANDARD HAC TWO LEVEL PLUMBING
1) Connect Water Supply:
•
In the left hand unit,connect the Filter outlet using 1/4” poly tubing to the Evaporator 1/4” copper inlet using
the supplied 1/4” quick connect fitting.
2) Add water supply to Bottle Filler:
•
In the left hand unit, cut the Evaporator outlet 1/4” poly tubing 5” from the access opening between the units
and insert the 1/4” Tee fitting between the two pieces.
TO BUBBLER
TO BUBBLER
REGULATOR
IN-LINE STRAINER
REGULATOR
FILTER
Fig. 5
L.H. DUMMY UNIT
R.H. REFRIGERATED UNIT
EVAPORATOR
OUTLET
EVAPORATOR
EVAPORATOR
INLET
L.H. DUMMY UNIT
R.H. REFRIGERATED UNIT
EVAPORATOR
EVAPORATOR
OUTLET
EVAPORATOR
INLET
REGULATOR
5”
TEE
TO BUBBLER
TO BOTTLE
FILLER
TO BUBBLER
REGULATOR
Buy at
| 855-558-9600 | BottleFillingStations.com