Page 2
HAC-HB*1B HAC-HB-NF-*1B
1000001732 (Rev. D - 06/16)
WATER COOLER PREPARATION
3) Remove Basin Fasteners
• Remove Basin Assembly by loosening
eight (8) screws, four on each side of
basin.
Remove Front Panel
Loosen Drain Line
Remove Basin Fasteners
1) Remove Front Panel
•
Remove lower front panel of water cooler
by removing the four (4) screws, two at
top and two at bottom. On Two Level
Models, remove both front panels.
•
WARNING: Before proceeding.
Disconnect electrical power supplying the
water cooler. Switch circuit breaker “OFF”
or remove fuse.
•
Unplug water cooler power cord from
electrical outlet.
•
Shut off water supply.
NOTE:
• On Two Level Models, the Bottle Filling Unit MUST be mounted on the higher unit:
• Two Level Standard Models; high unit is on Left Hand(LH) side.
• Two Level Reverse Models; high unit is on Right Hand(RH) side.
2) Loosen Drain Line
• Loosen Slip-Joint Nut at P-trap.
• Note: Have container/bucket readily available
to catch water from lines.
Buy at
| 855-558-9600 | BottleFillingStations.com