Halma Perma Pure Zero-Air User Manual Download Page 7

 

 
 

 

7

 

COPYRIGHT 2008, ALL RIGHTS RESERVED, Original Instructions 

 PERMA PURE LLC 

 

Zero-Air™ Generator User’s Manual 

Doc. ZA-MAN-001 REV 01 

Page 7 of 10 

 

Maintenance 

 
WARNING !! 

 

De-pressurize and unplug the ZAG before attempting any maintenance or 

removing the top or bottom panels! 

 

Routine maintenance consists of periodic carbon replacement and outlet filter replacement. 

Under normal, intermittent use, desiccant should last up to six months. 

 

Activated carbon/alumina replacement 

Activated carbon canister is located behind top panel. Top half of canister is exposed to 

allow visual inspection of mixture. As the mixture is used, its color changes from purple to 

brown. When ¾ of the canister has changed to brown, replace mixture. The mixture can not 

be regenerated and must be discarded. 

 
Replacing the mixture

 

1.

 

Place towel or cloth across bottom panel to prevent scratches. 

 

2.

 

Disengage four (4) panel screws by turning ¼ turn counterclockwise. 

 

3.

 

Pull panel out and lay down on top of bottom panel. 

 

4.

 

Unscrew nuts off brackets. 

 

5.

 

Detach tubing by loosening compression fittings using 5/8” wrench. 

 

6.

 

Remove canister from panel. 

 

7.

 

Remove bottom black plug using 7/8” wrench. 

 

8.

 

Pour out pellets while tapping canister lightly. 

 

9.

 

Re-fill canister by slowly pouring in fresh activated carbon/impregnated alumina 

mixture. 

 

10.

 

Tap side of canister while filing to settle mixture and reduce air pockets. 

 

11.

 

Apply Teflon® tape to the plug and replace in bottom of canister and tighten. 

 

12.

 

Reverse procedure to install canister to ZAG. 

 

 

 

 

Summary of Contents for Perma Pure Zero-Air

Page 1: ...PERMA PURE LLC 732 244 0010 800 337 3762 fax 732 244 8140 www permapure com info permapure com PERMA PURE LLC 1001 NEW HAMPSHIRE AVE LAKEWOOD NJ 08701 Zero Air Generator User s Manual...

Page 2: ...Introduction 3 General description 4 Specifications and features 5 Important safety warnings 5 Start up procedure 6 Maintenance 7 Activated carbon alumina replacement 7 Final filter replacement 8 Fus...

Page 3: ...outside of your equipment for any damage If there is any damage contact the carrier immediately Generally a carrier must be notified within 24 hours of the delivery to make a hidden damage claim Items...

Page 4: ...urrent purge air Ultraviolet Lamp The UV lamp produces approximately 1 3 ppm of ozone which breaks down microorganisms into carbon compounds that are removed further downstream It also oxidizes NO to...

Page 5: ...closure unsecured All operated covers must be in place and secured prior to operation Electrical current may be present behind covers even if tools are not necessary to access these components NEVER a...

Page 6: ...r clockwise to open fully 5 Connect calibration gas line to tube compression fitting located on top panel of generator 6 Turn power switch to ON position 7 Adjust flow control valve to desired air out...

Page 7: ...o brown When of the canister has changed to brown replace mixture The mixture can not be regenerated and must be discarded Replacing the mixture 1 Place towel or cloth across bottom panel to prevent s...

Page 8: ...se replacement If unit fails to run when plugged in and turned on first check the fuse 1 Disconnect power cord from power input module on bottom panel of unit 2 Using slotted tip screwdriver pry up at...

Page 9: ...r that the product shall in fact be suitable or desirable for any particular use or application 2 Buyer takes sole responsibility for the use and applications to which the product is put and Buyer sha...

Page 10: ...PERMA PURE LLC Zero Air Generator User s Manual Doc ZA MAN 001 REV 01 Page 10 of 10 Appendix B Wiring diagrams Figure 4 Wiring diagram 115 VAC...

Reviews: