![Halma Perma Pure Zero-Air User Manual Download Page 6](http://html1.mh-extra.com/html/halma/perma-pure-zero-air/perma-pure-zero-air_user-manual_3354621006.webp)
PERMA PURE LLC
Zero-Air™ Generator User’s Manual
Doc. ZA-MAN-001 REV 01
Page 6 of 10
Start-up procedure
1.
Place ZAG on level, dry surface.
2.
Check to make sure power switch is in “OFF” position.
3.
Plug unit into standard 115VAC electrical outlet.
4.
Turn flow control knob counter-clockwise to open fully.
5.
Connect calibration gas line to ¼” tube compression fitting located on top panel of
generator.
6.
Turn power switch to “ON” position.
7.
Adjust flow control valve to desired air output. Maximum capacity is 18 lpm.
8.
High purity air will be produced within 23 minutes after start-up.
NOTE: There is a trade off between air pressure and flow. High air volumes will result in lower
air pressure, and vice versa (see figure 3).
Figure 3 - Flow rate vs pressure curve