Halls Greenhouses Altan Halls Wall Garden 42 Manual Download Page 2

May we congratulate you on your new Greenhouse 

Dear Customer! 

The  assembly  of  your  new  greenhouse  requires no 
technical  knowledge.  However,  it  is  important  that 
the  assembly  instructions  are  strictly  followed. The 
assembly  instruction  is  a  combination  of  text  and 
illustrations.  The  profiles  are  packed  separately  in 
numbered packs corresponding  to  the  order  in the 
assembly  instruction.  Erect  one  pack  at  a  time.  All 
nuts  bolts  and  fittings  are  found  in  bag  No.  0 
(specified  on  page  12).  Each  pack  is  specified  in 
separate lists of components. 
All detailed illustrations are marked with symbols: 

Seen from inside 

  Seen from outside 

Precautions. 

Assembly must be carried out in dry, calm 
weather.

Always use working gloves while glazing. 
Greenhouse  glass  has  sharp  edges, 
especially if it breaks.

Assistants  and  especially  children  must 
be warned broken glass is an element of 
danger. Pick up broken glass at once and
remove with care.

We recommend to use protective glasses 
while fixing spring wire glazing clips.

Place the ladder on a level support.

It is essential to have an assistant.

  indicates the page(s) 

References. 
The column marked       
on which the component is used. 

Page 13 - 14: 
Foundation
 
If you are not using the pre-fabricated base for this 
greenhouse, you must have an alternative base to 
raise the frame off the ground, otherwise the door 
will not run correctly. If you are making your own 
base, the measurements indicated must be external 
measurements. We recommend 19mm x 32mm 
pressure  treated  timber  for  DIY  base,  also  for 
wall battens. 

Make sure that your base is anchored 

to a solid foundation. 

For the pre-fabricated base, you furthermore need 
about 

40

 litres of concrete and 

2

 plastic concrete 

pipes  of about 800mm which are placed in a 
non-freezing depth for the fastening of the corner 
and/or middle anchors. 
The base must be 100% level and square; the latter 
is ensured by checking the two diagonal 

measurements are equal. 

For the pre-fabricated base

,

concrete

 

sleepers

 

or

 

slabs

 

pad,

 

 

i.e.

 

foundation

 

solid

 

a

 

on

 

the ground anchors

 

 

will need to be cut to the height of the base with a

 

 

 

hack saw as they are  also corner bracket

(A)

s.

Tools 
The mounting of the greenhouse requires the tools 
shown on page 12. 

 
 

Pages 14-30: 
Place  the  components  as  shown  on  the  illustration 
and assemble in the order shown in the pictures. Do  
not tighten the nuts completely until the front gable 
construction has been assembled. 

Fitting of glass/polycarbonate 
Important before glazing! 

Make sure that the gables and sides are level and 
square,  and  that  the  door(s)  and  window(s)  are 
functioning perfectly. 

Best order of assembly: 
1)

Front

 

– 2)

Roof

 

 – 3)

Wall

 

 

Fixing

 

– 

4)

Door

 

 – 5)

Vent

 

 –

6

  )   Glazi

.

ng

Remember to insert extra bolts in profiles

00962

 

 to fit

00931/00932

.

Pages 26-29: 
Glazing 
Fit  glazing  strip (411)  to  all  glazing  bars,  gable  bars 
and corner posts (vertical bars) before you begin to 
glaze the greenhouse. 
Start glazing the roof first (working from the bottom 
up for horticultural glass), one pane at a time. 

Spring wire clips and glass holder clips are to be fitted 
as shown. 

X 

=

 

Spring wire clips,

 

= Glass holder clips

 

Page 30: 
Mounting of Polycarbonate 
The illustrations on page 32 show where to mount 
them. The type indication states the length in mm. 
A possible adjustment is made by means of a fine-
tooth saw. 
NB! To avoid the formation of algae the 
polycarbonate sheets must not come into contact 
with the ground. Rest them on a piece of 
cardboard. 

J, K, L, M – lists are mounted as shown on page 30. 

Sealing of the polycarbonate sheets 
The sheets may be sealed against insects. Close the 
top-end off with alu-tape (NOT SUPPLIED) or 
silicone (NOT SUPPLIED)
The bottom only with airstrip tape (NOT SUPPLIED) 
to let condensation out.  

 
 

Now your greenhouse is completely assembled. 
However, please notice the following: 

Maintenance 

Grease doors (hinges and lock or door
track).

Clean the gutter for leaves, etc.

Adjustment of windows.

Replacement of broken glass.

Clean the greenhouse with disinfectant 
before and after the growing season.

Winter Protection 
In areas with occurrence of snow we recommend 
the following winter protection. 

Support the roof ridge at the centre of 
the greenhouse.

Remove greater snow loads from the 
roof.

Take precautions against snow falling
down from a tree for instance, or a roof.

Dismount the cylinders for the automatic 
window openers, if any (optional extras).

Secure door(s) and window(s) preventing
wind damage to the greenhouse.

Insurance 
Please note that not all insurance companies cover 
greenhouses  automatically.  Please  contact  your 
insurance company to ensure an insurance coverage. 

Guarantee 
The  greenhouse  frame  only,  has a  guarantee  of  12 
years  which  covers  replacement  of  faulty 
components.  
The guarantee does not cover glass, polycarbonate, 
assembly, freight etc. 
There is a 2 year guarantee on painted parts, if any. 
Note  that  marks  in  the  painting  may  occur  due  to 
suspension of the profiles. 
The  guarantee  is  invalid  if  the  greenhouse  is  not 
assembled according to these instructions. 

Complaints 
All  our  greenhouses  are  built  to  high  standards  of 
quality. However, should a complaint occur, please 
contact  your  dealer  at  once.  Remember  to  specify 
the defect by indicating the greenhouse model and 
number  of  the  component,  and  if  possible,  the 
quality control number. 

GB 

USA

www.hallsgreenhouses.com 

Please refer to website for the most up to date instructions. 

Summary of Contents for Altan Halls Wall Garden 42

Page 1: ...42 62 Altan Halls Wall Garden 22 06 2022 1 01 Model 42 0 9m2 62 1 3m2...

Page 2: ...g perfectly Best order of assembly 1 Front 2 Roof 3 Wall Fixing 4 Door 5 Vent 6 Glazi ng Remember to insert extra bolts in profiles 00962 to fit 00931 00932 Pages 26 29 Glazing Fit glazing strip 411 t...

Page 3: ...tigmontiert aber bitte folgendes beachten Pflegetips Die T rscharniere Aufh ngungen und Schlo oder Gleitschiene regelm ig einfetten Die Dachrinne von Bl ttern u dgl reinigen Nacheinstellung der Fenste...

Page 4: ...som vist p tegning B Montage af glas Vigtigt f r montage Kontroller at gavle og sider er i lod og vinkel samt at d r og vindue fungerer perfekt Bedste monteringsr kkef lge 1 Front 2 Tag 3 Fastg relse...

Page 5: ...s ttning i fundament N r Ni sj lv konstruerar fundamentet borras h l 7 mm i bottenramen mellan alla lodr tta profiler och sedan skruvas v xthuset fast p fundamentet A Om Ni anv nder orginalfundament s...

Page 6: ...percer des trous de 7 mm dans le cadre de base entre tous les profils horizontals avant de fixer la maison sur le fondement A Si vous employez le fondement original vous fixez la maison chaque barreau...

Page 7: ...ton nodig en 2 kunststof betonbuizen van ca 800 mm die tot vorstvrije diepte worden ingegraven voor het bevestigen van de hoeken en middenankers De fundering moet 100 waterpas en haaks zijn Het laatst...

Page 8: ...i Ud mismo construye el fundamento debe taladrar agujeros 7 mm en el bastidor entre todos los perfiles verticales despu s de lo cual el invernadero se atornilla al fundamento A Si utiliza un fundament...

Page 9: ...ompletamente i dadi prima di aver parzialmente assemblato tutta la costruzione Pagina 13 Fissaggio al basamento In caso di un basamento costruito per conto proprio necessario praticare dei fori 7 mm n...

Page 10: ...ehty perustusta varten 7 mm reik kiinnitysruuvia varten joka v liin Julianan valmiin perustuksen kiinnitys tapahtuu perustuksen mukana tulevien osien avulla kuva B T rke Lasin kennolevyn asennukseen T...

Page 11: ...e Overzicht Resumen Schema Sis llys 12 13 14 15 16 17 18 21 22 19 20 Tools Werkzeug V rkt j Verktyg Outillage Gereedschap Herramientas Utensili Ty kalut Fittings Raccorderie Hulpstukken Garnitures Acc...

Page 12: ...Accessoires Toebehoren Accesorios Accessori Lis varusteet 3 1 B 42 62 1293mm 1915 mm 646mm 646 mm 1445mm 2021mm 42 62 1293 646 1915 2 1 2 2 16 16 16 16 1 5 6 1 1 2 2 2 10 2 2 114 345 996 995 989 889...

Page 13: ...Forberedelse Preparation Vorbereitung Forberedelse Preparat forberedlser preparativos preparativi Valmisteet 835 839 828 960 961 962 14 411...

Page 14: ...Front Avant Voor Frente Anteriore Edess 2 3 4 1 154 835 832 154 839 1 mm 154 835 839 832 1235 1506 1506 1235 1 2 1 1 42 155 1857 833 1857 835 839 832 154 835 835 839 832 42 1 2 4 3 15...

Page 15: ...Front Avant Voor Frente Anteriore Edess 2 3 4 1 154 155 835 832 833 154 155 839 155 3 4 1 2 835 835 839 839 833 1 mm 154 835 839 832 1235 1506 1506 1235 2 2 62 155 1857 1 833 1857 1 835 839 832 833 6...

Page 16: ...62 2 mm 834 960 961 610 1748 68 6 668 2 1 1 1 42 828 1748 951 1235 829 1 1 959 1857 962 1 834 834 828 829 960 961 951 962 835 960 832 828 951 832 951 962 Roof Dach Tag Tak Toit Dak Tejado Tetto Katto...

Page 17: ...mm 834 960 961 610 1748 668 668 1 1 62 828 1748 1 951 1235 2 829 1 959 1857 1 962 2 653 962 835 960 833 828 959 833 959 962 Roof Dach Tag Tak Toit Dak Tejado Tetto Katto 835 835 839 839 155 959 962 82...

Page 18: ...il v g Inf stning Fixation au mur Gehechtheid Afijaci n Attaccamento Liite 2 1 951 959 459 1 2 3 mm 426 406 459 11 1 12 1 42 62 1 11 12 8000 406 426 828 829 426 459 406 Fra Siden From side Ab seite de...

Page 19: ...Deur Puerta Porta Ovi 479 268 840 333 2 4 1 3 4 mm 840 265 1486 620 2 2 1 2 2 1 1 1 42 62 268 1 1 610 266 620 267 620 478 2 2 1106 16 16 6X16 479 1 1 2 2 333 1485 478 1106 840 267 10cm 840 333 74 18 2...

Page 20: ...10 12 11 1106 840 266 268 1106 840 265 1106 840 265 1106 840 478 268 267 833 13 267 478 10cm 5 265 840 1106 6 265 840 1106 7 840 268 1106 266 268 266 14 74 833 Door T r D r D rr Porte Deur Puerta Por...

Page 21: ...nster Vinduer F nster Fen tres Ramen Ventanas Finestre Luukut 2 3 4 1 4 928 43 2 1 5 929 930 929 5 mm 928 930 932 305 635 398 610 620 1 2 1 1 1 1 2 1 1 42 62 929 931 1 638 928 929 930 929 928 929 929...

Page 22: ...men Ventanas Finestre Luukut 5 6 7 8 932 929 961 962 11 305 930 962 932 Wall Garden 42 Wall Garden 42 9 931 931 962 Wall Garden 62 Wall Garden 62 10 Wallgarden 42 961 Wallgarden 62 962 Wallgarden 42 9...

Page 23: ...Glass Glas Verre Cristales Vetro Lasit 458 12mm 453 X 82 X 82 X 82 X 82 X 82 X 82 X 82 X 82 X 82 X 82 X 82 X 82 X 1 2 m m 1 2 3 4 7 6 5 411 24...

Page 24: ...E E B A A A A A A A A C B E E B DD DD x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x...

Page 25: ...0 610x298 610x1760 1514 610x275 610x1514 X 411 72 1 92 1 42 62 mm 18000 22000 6 D D G A A C E E F B D G A A C E F B x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x...

Page 26: ......

Page 27: ......

Page 28: ...24 This product is delivered by a company in the Juliana Group www juliana com www hallsgreenhouses com...

Reviews: