Halex 22-Q Electronic Dartboard _ 3
Setup / Mounting Instructions
Choose a location to hang the dartboard where there is about 10 feet of open space in front
of the board. The “toe-line” should be 7’ 9 1/4” from the face of the dartboard. Since this
dartboard can be powered with the included AC adapter, you may want to mount it close to
an electric outlet for convenience.
Locate a wall stud and place a mark 79 3/4” from the floor. Place another mark at the
same height 16” from the first mark. Due to the weight of the dartboard and cabinet, it is
recommended you mount onto the wall studs. If this is not possible, we have included 2
drywall anchors.
Bullseye height should be 5’ 8” from the floor
.
Toe line should be 7’ 9
¼” from face of board.
Screw 2 cabinet mounting screws (long) in the center of the stud using the marks you made
as guides. Be sure the screws are level with one another (use a level for accuracy) to
ensure dartboard will be level.
Mount the dartboard to the cabinet before mounting to wall. Lay cabinet on floor with doors
open. Note the 4 screw receivers embedded in the backboard of the cabinet. Place the
dartboard into the cabinet and line up holes with screw receivers. The holed on the
dartboard are located in the catch ring area outside the scoring segment area. Using a
small Philips- head screwdriver, screw the dartboard mounting screws into the receivers.
The dartboard is now attached securely to the cabinet.
To mount the cabinet to the wall, simply line up the screws on the wall with the hang
brackets located on the back of the cabinet (top edge). It may be necessary to adjust the
screws until the board fits snugly against the wall.
Plug the A/C adapter into the wall outlet and into the jack at the bottom right of the
dartboard through the hole in the right side of the cabinet.
Cabinet
Hang Brackets
Dartboard
Screw
Receivers
Inside Cabinet Frame
Cabinet Diagram