background image

CX1000

(Slide Unit)

Instruction Manual

1. PACKING LIST AND PART NAMES

2. CONNECTING COMPONENTS

HAKKO FU-500

HAKKO FU-6001

3. MAINTENANCE

CAUTION

Positioning of the tension spring

1. Insert the connector after removing the connector cover.

2. Attach the solenoid valve after removing the 2 side screws.

3. Connect the tubes to the solenoid valve A and B.

   Also, insert the φ4mm air tube (not included) into the solenoid valve.

1. Attach the iron unit fixing assembly to the slide unit by using the provided

   four screws.

2. Attach the HAKKO FU-6001 to the iron unit fixing assembly.

Never use thinner or other solvent to wipe the unit.

Doing so may melt the resin part.

Regularly wipe off the adhered flux using alcohol.

Thank you for purchasing CX1000 slide unit.

Please read this manual before operating the CX1000.

Keep this manual readily accesible for reference.

CX1000

(

滑座裝置

)

使 用 說 明 書

1. 包裝清單及各部名稱

準備物品

2. 各部位的連接

HAKKO FU-500

HAKKO FU-6001

HAKKO FU-6001

3. 維修保養

拉力彈簧的位置設定

拉伸強度

 A-C間

 A-D間

 B-C間

 B-D間

1. 取下HAKKO FU-500的連接器護蓋,裝上連接器。
2. 取下HAKKO FU-500側面的2處螺絲,裝上電磁閥。
3. 分別於電磁閥A、B插入各自附屬的軟管,並接上另外準備的φ4mm氣管。

1. 利用附屬的4顆螺栓將焊鐵裝置安裝座安裝於滑座裝置上。
2. 將HAKKO FU-6001安裝於焊鐵裝置安裝座上。

A

B

D

C

請定期使用酒精擦拭助焊劑。

承蒙惠顧,謹致謝忱。

使用滑座裝置前,請詳閱本使用說明書。

閱後請妥為收存,以備日後查閱。

注意

稀釋液等溶劑可能導致樹脂部位溶解,切勿使用。

Limit the input air pressure at 0.2 MPa to 0.7 MPa to maximum.

Be sure to use the air filter. Otherwise, dust in the piping may

be stuck in the main unit and cause a problem.

CAUTION

注意

設定空氣輸入壓力為 

0.2MPa

 以上,

0.7MPa

 以下。

必須使用空氣過濾器,否則塵埃堵塞在機身內會造成故障。

Connector

(To the HAKKO FU-500)

Solenoid valve

Slide position

adjust screw

Sensor cord

(3m)

Tube(2m) ×2

Tension spring

Spring post ×2

(One is on the unit)

Iron unit attachment

screw ×4

連接器

(連接HAKKO FU-500)

電磁閥

滑座位置調整螺栓

傳感器電線

(3m)

軟管(2m)×2

拉力彈簧

彈簧支柱×2

(本體中已安裝一支)

焊鐵裝置固定螺栓×4

Tensile strength

A

B

D

C

1. A - C
2. A - D
3. B - C
4. B - D

Low

High

Iron unit fixing assembly

Hole A

Hole B

Hole D

Hole C

Spring post

Spring post

A孔

B孔

D孔

C孔

焊鐵裝置安裝座

彈簧支柱

彈簧支柱

Please check to make sure that

all items listed below are included

in the package.

首先請確認包裝內容。

Attachment screws

(M2×12)

Connector cover

φ4mm

air tube

(not included)

φ4mm氣管

(須另購)

安裝螺絲(M2×12)

連接器護蓋

HAKKO FU-500   (Solder feed unit)

HAKKO FU-600   (Soldering iron unit)

HAKKO FU-6001 (Soldering iron)

TX1 Series tip

Air tube (φ4mm) × 1

HAKKO FU-500

HAKKO FU-600

HAKKO FU-6001

TX1系列焊鐵頭

φ4mm 氣管 × 1

Iron unit fixing assembly

HAKKO FU-6001

From

solenoid valve A

From

solenoid valve B

焊鐵裝置安裝座

從電磁閥 

A

從電磁閥 

B

NOTE * Specifications and design are subject to change without notice.

注記 

*

 規格及外觀有可能改良變更,恕不先行通知。

Preparation

(送錫控制台)
(焊鐵裝置)
(焊鐵)

A B

A B

Reviews: