HAKKEN SPZ-252U2i Instruction Manual Download Page 7

-5-

 

 WARNING

 

 

15. Do not use the Core Bit which exceeds the maximum diameter of Core Bit.

 

16. Connection for water supply must be ensured. 

◎ 

Water might be splashed to the electric tool or person in working area. 

17. In case that Pole Base is fixed, ensure to fix it at stable place. 

18. If accessories are broken, don’t use it. Repair or replace. 
19. Check the Core Bit, tube and coupling with no crack, tipping or deformation by visual 

confirmation. In addition, check the excessive wearing at edge of Core Bit or part of 
shank. If there is any abnormal things, never use Core Bit. 

20. If the cutting performance becomes lower, do dressing. If you use lower performance 

Core Bit, it becomes high temperature and break, then there is possibility to get injured. 

◎ 

Drill to rough grind stone or soft cutting material. (Concrete block, brick, or grind stone) 

21. Be sure to switch off Core Drill before pressing Green on Button of PRCD. 

 

 

 CAUTION

 

 

1. Do not overload with Core Drill.

 

  Use the machine according to the machine capacity of specifications in order to use safely 

and efficiently. 

2. When drilling, please supply the water for sure.

 

  Overheating of Core Bit reduces not only  drilling performance but also its life. So make 

sure to keep supplying water during drilling operation. 

  Use clean water only. Using the dirty water may cause machine failure.

 

3. Do not turn on the motor with Core Bit facing to the drilling surface.

 

  It causes the damages for Core Bit and Core Drill. 

4. When starting the 

drilling

, please wait until the rotating is increased.

 

  Regarding the drilling work, turn the switch on and wait until the rotating is increased fully. 

5.  Do  not  stop  rotating 

of

  Core  Bit  by  forcing  the  power  on  the  feeding  handle  during 

drilling, and do not lock the Core Bit.

 

  It might cause the damages for the chip of Core Bit and Core Drill. 

6. 

When

 releasing your hands from the feeding handle, please make sure that Lock 

Dial is tighten, then, fix the Drill Head.

 

  When loosening Lock Dial, please hold the feeding handle in order not to move the Drill 

Head.

 

7. Before starting operation, 

test

 PRCD in the following procedures.

 

  Plug Power Cord and press Green on Button. Make certain Red Lamp is on. 

  Press Blue TEST Button and make certain Red Lamp is off.

 

  Press Green on Button again and make certain Red Lamp is on

.

 

 

 

 

 

Summary of Contents for SPZ-252U2i

Page 1: ...U2i INSTRUCTION MANUAL Thank you for purchasing our products Before using please read Instruction manual carefully and use the machine safely by following the instructions After reading please keep it...

Page 2: ...ION The instruction manual includes two signal words WARNING CAUTION which are meant as follows WARNING It is assumed that if the user uses the machine wrongly it would be the risks that the user coul...

Page 3: ...IFICATIONS 8 4 STANDARD ACCESSORIES 8 5 APPLICATIONS 8 6 GENERAL DRAWING AND SPECIFICATIONS IN OPERATION 9 7 OPERATIONAL INSTRUCTIONS 1 Anchoring Core Drill 10 2 Anchoring Core Drill by Anchor Bolt 10...

Page 4: ...Wear cap or hair cover in case that you have long hair 5 Wear ear protector such as earplug or ear muffs Wear ear protector in the place of noise 6 Wear safety glasses Wear safety glasses during worki...

Page 5: ...ch please make sure that the key and the wrench which are used for the inspection and adjusting are removed 15 The electric machines are maintained carefully Regarding exchanging the options please fo...

Page 6: ...en please start operating 6 Use the proper voltage which is indicated on the nameplate In case that you apply for the voltage which is over the indicated voltage it will cause the accidents 7 Fix the...

Page 7: ...fely and efficiently 2 When drilling please supply the water for sure Overheating of Core Bit reduces not only drilling performance but also its life So make sure to keep supplying water during drilli...

Page 8: ...e Base After combining with Drill Carriage and Pole Base the distributor must make a CE marking and issue CE DECLARATION OF CONFORMITY 2 Drill Carriage Assy and Pole Base which are mounted on Drill Mo...

Page 9: ...cuit Breaker Carbon Cap Name Plate Feeding Handle Unified screw 1 1 4 7 UNC The outside of Main Shaft Lock Dial Clamp Adjust Bolt Hex Socket Set Screw Grip Hose Band 00 Standard Accessories Plug Hose...

Page 10: ...uding cord 13 6kg Max Burst Pressure Hose 3 9MPa 4 STANDARD ACCESSORIES Hose Band 00 1 Hose 12 250 1 Water Cock 1 4 Gardena 1 Hex Bar Wrench 4mm 1 Instruction Manual 1 5 APPLICATIONS This tool is Core...

Page 11: ...CIFICATIONS IN OPERATION Drill Head installed on to 49 Pole Base Drill Motor Feeding Handle Core Bit Water Collector 49 Pole Base Bolt Square Washer Hex Nut Leveling Bolt Water Collector Fitting Drill...

Page 12: ...ign main shaft with the hole to be drilled 5 Adjust leveling with leveling bolts so as to eliminate rattling of pole base After completion of adjustment secure leveling bolt with wing nut 6 Tighten he...

Page 13: ...on Start drilling by turning feeding handle slowly until Core Bit in light contact with work surface While starting to drill apply light pressure on feeding handle until drill bit penetrates to 5 10mm...

Page 14: ...with the soapy water 2 Maintenance for motor After entire operation is over secure Drill Head onto Pole Base run motor with no load and remove dirt and dust from motor interior 2 Regular Servicing 1...

Page 15: ...gets heavy When slide plate is worn and starts to rattle replace it 3 Checking and adjustment of clutch As Friction Plates wear out the clutch becomes easy to slip When this happens readjust the clutc...

Page 16: ...is locked Turn the motor switch on for just a moment and make sure that the clutch is slipping without motor locking WARNING Be careful for the position of Single ended Wrench 36mm touching on pole S...

Page 17: ...s at a distance of 1 meter from the surface of the machinery and at height of 0 8 meter from the floor during no load operation 11 WARRANTY We will guarantee the HAKKEN Core Drill SPZ 252U2i for 6 mon...

Page 18: ...Z 252U2i Council Directive 2006 95 EC 2004 108 EC 2006 42 EC Relative Standard EN292 1 EN292 2 EN55014 1 EN55014 2 EN61000 3 2 EN61000 3 3 EN61000 4 2 EN61000 4 4 EN61000 4 5 EN61000 4 6 EN61000 4 11...

Page 19: ...17 MEMO...

Page 20: ...18 Main office 4 6 8 Shoko Center Nishi ku Hiroshima 733 0833 Japan International Department 1 7 5 1 Sakaimachi Naka ku Hiroshima 730 0853 Japan Phone 81 82 297 3231 Fax 81 82 297 3230 E1930 1...

Reviews: