
B-Top3
Installation
44
Order h49 7144.907-333
7.5 Installation of the product
A
Spindle flange
A1 Fixing screws on spindle flange
B
Functional unit
B1 Fixing screws, function unit
C
Base jaws
a
Test surface, axial run-out, spindle flange
b
Test surface, face run-out, spindle flange
c
Test surface, face run-out, functional unit
d
Test surface, axial run-out, functional unit
1. As described in the »Preparation of the machine for in-
stallation« chapter, prepare for the following steps.
7.5.1 Compatibility check
Check the compatibility of the product and the connection
point of the machine.
For this, check that the connection point and the product
share the same adaptation geometry. Also check if the actu-
ating element / coupling element is suitable.
It may be necessary to install an adapter between the actu-
ating element on the machine and the product.