![Hainbuch B-Top 260 Operating Instructions Manual Download Page 55](http://html1.mh-extra.com/html/hainbuch/b-top-260/b-top-260_operating-instructions-manual_3248616055.webp)
B-Top
Installation
Order h49 7144.907-333
55
Whenever the face run-out is greater than the maximum per-
mitted value:
12. Remove the functional unit.
13. Clean the locating face and the mating faces of the spin-
dle flange and the functional unit.
14. If there is a burr or slight damage, rub down the locating
face of the spindle flange or the functional unit gently
with an oil stone.
15. Reinstall the functional unit.
16. Repeat the alignment process.
17. Repeat the face run-out test.
18. Install the integrated liner into the functional unit.