31-5000496 Rev. 1
7
Installation Instructions
Console Installation
Step 5. Piping Configuration and
Installation
A. Piping Configuration
Rear Piping: NOTE:
Rear piping may exit at any
position at the back of the unit.
Route the line set and drain hose through the rear
opening.
Left & Rear-Left Piping
: When routing left or rear-left
piping, carefully bend the line set and drain hose to
keep flush with the piping cavity in the rear of the unit.
Removed the left side knock-out if routing out of the left
side.
Other
: Remove the appropriate piping knockout (if
required) according to the desired piping direction, and
carefully route the piping to the wall hole.
Left
Left Rear
Right
Rear
Right
Below Right
Below Left
Console Installation
Step 4: Piping Bundle Hole
A. Determine Hole Position
1. Determine the hole position based on desired piping
configuration.
Bottom View
2 1/2” (65)
5/8” (16)
4 1/2” (115)
2 3/4”
(70)
3/4” (19)
3 1/4” (83)
2-19/20 (75)
2-19/20 (75)
9/19 (12)
9/19 (12)
3-4/15 (83)
3-4/15 (83)
5 3/4” (147)
For Right or Left Side Piping
B. Drill Hole
1. Drill a 2-3/8” downward-pitched hole for the
refrigerant line/condensate drain/wiring bundle.
2. Once bundle is installed, seal the hole.
Wall hole
(Section of wall hole)
Piping hole pipe
Thickness of wall
Indoor side
Outdoor side
G
55mm