507332-02G / 31-5000663
Page 10 of 35
Issue 2209
Table 1.
Non-Combustible Floor Opening Size
Cabinet Width
Front to Rear
Side to Side
in.
mm
in.
mm
A (14-1/2”)
19-3/4
502
13-1/4
337
B (17-1/2”)
16-3/4
413
C (21”)
19-3/4
502
NOTE
: Floor opening dimensions listed are 1/4 in. (6 mm)
larger than the unit opening. See dimension drawing on Page
Figure 10.
Installation on Combustible Flooring
1.
When unit is installed on a combustible floor, a
downflow combustible flooring base must be installed
between the furnace and the floor. The base must be
ordered separately. See Table 2 for opening size to
cut in floor.
The furnace and combustible flooring base shall not be
installed directly on carpeting, tile, or other combustible
material other than wood flooring.
CAUTION
Table 2.
Combustible Flooring Base Opening Size
Cabinet
Width
Catalog
Number
Front to Rear
Side to Side
in.
mm
in.
mm
A (14-1/2”)
11M59
22
559
15-3/4
400
B (17-1/2”)
11M60
18-3/4
476
C (21”)
11M61
22-3/4
578
Figure 11.
2.
After opening is cut, set the combustible flooring base
into opening.
3.
Check fiberglass strips on the combustible flooring
base to make sure they are properly glued and
positioned.
4.
Lower supply air plenum into the combustible flooring
base until plenum flanges seal against fiberglass
strips.
NOTE:
Be careful not to damage fiberglass strips.
Check for a tight seal.
5. Set the furnace over the plenum.
6. Ensure that the seal between the furnace and plenum
is adequate.
Installation on Cooling Coil Cabinet
NOTE:
Downflow combustible flooring kit is not used.
1.
Refer to reverse flow coil installation instructions for
correctly sized opening in floor and installation of
cabinet.
2. When cooling cabinet is in place, set and secure the
furnace according to the instructions that are provided
with the cooling coil. Secure the furnace to the cabinet.
3. Seal the cabinet and check for air leaks.