7
Be sure to have it installed by the installation staff from the after-sales service center of
the manufacturer or a center authorized by them. It adopts floorstanding installation.
Locate the water heater and install all the pipes with a tap water tube (PP-R pipe is
recommended) according to the dimension diagram and the user's requirements.
Mount the relief valve and other accessories according to figure . Remember to use
Teflon seal tape to avoid leakage.
To facilitate installation and dismantling of the water heater, it is recommended to fit a
G1/2
at the suitable location on the water inlet pipe and outlet pipe
separately. Confirm the positions needing water supply and connect the water inlet
pipe, outlet pipes and tap water pipes to the locations separately.
When installing the water heater, please reserve certain space to facilitate future
maintenance and repair. Fig. is only a reference installation schematic of pipelines.
In specific installations, the actual situation of the user should be considered.
2
2
flexible nut
Installation methods
Precautions during installation
Make sure the inlet pressure of the tap water is not less than 0.05MPa.
The electrical water heater shall be installed indoors where the ambient temperature is
over 0
. The pipelines shall be arranged centralizedly. The location of hot water usage
should not be too far way from the water heater. If the distance is more than 8 meters,
the pipe shall be wrapped with a heat preservation layer to reduce heat loss.
In selecting the installation location of the water heater, convenient usage and
repairing should be considered. Besides, it must be installed in a place with a sewer so
that it will not cause damage to facilities nearby or downstairs when the water tank
and/or pipes leak.
Do not confuse the water inlet pipe and outlet pipe. The relief valve shall be installed in
the specified location. No change is allowed. Its pressure relief hole must be kept
unblocked.
To ensure safety, please use a separate socket (never use a multifunctional socket)
which is reliably grounded and complies with national standard. Check with an
electroprobe to ensure that the live wire and the neutral wire are not connected
backwards. Do not turn on the power before ensuring that it is fully filled with water, that
there is no leakage from any joints, and that the power supply meets the requirements.
(Fig.2)
For reference only
Indicator
lamp
Indicator
lamp
Blowdown port
Water inlet pipe
Water outlet pipe
Check valve
Drain hose
Relief valve
Dimension diagram
6
Appearance and components
Fig 1
Note:
the allowed error range of above parameters is
10%.
Model
Volume
a1
b1
c1
200L
245L
1220mm
1399mm
Net
weight
58kg
65kg
FCD-JTLD200
FCD-JTLD245
629mm
629mm
601mm
601mm
a1
120
b1
a1
c1
Relief valve
Shell
Heat preservation
layer
Enamel inner tank
Electrical
cabinet 1
Electrical
cabinet 2
Heating
element 1
Heating
element 2
Magnesium
anode rod 2
Magnesium
anode rod 1
Blowdown pipe
Check valve
Blowdown port
Indicator lamp
Indicator lamp
Appearance and components
Installation methods
Precautions during installation
Dimension diagram